List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Element | Performance criteria |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare for work | 1.1 Identify drainage system issues and develop plans to rectify them 1.2 Locate the affected section of drainage system 1.3 Determine work requirements and responsibility for repair 1.4 Select materials, tools, equipment and machinery 1.5 Carry out pre-operational and safety checks on tools, equipment and machinery 1.6 Identify work health and safety hazards, assess risks and implement controls 1.7 Select, use and maintain suitable personal protective equipment |
2. Determine access to drainage system | 2.1 Access plan of drainage system and locate access points 2.2 Carry out digging without unnecessary damage to buildings, site, environment or existing fixtures and fittings |
3. Carry out work | 3.1 Use safe manual lifting and handling techniques 3.2 Access drainage system and rectify identified issue 3.3 Test drainage system to confirm issue has been rectified 3.4 Repair or reseal drainage system to permit normal use 3.5 Advise relevant personnel that repairs have been completed and the drainage system has been commissioned for use |
4. Complete work | 4.1 Clean work area and dispose of debris and waste 4.2 Clean and maintain tools and equipment |
The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.
The candidate must provide evidence that they can:
complete a range of rectification works
identify a range of drainage system issues relevant to their industry, including surface and sub-surface issues
inspect the site to determine access to drainage system
plan and prepare for the work
test the system and clean up after rectifying the identified issues
The candidate must demonstrate knowledge of:
principles and practices of drainage system troubleshooting
components used in drainage systems
environmental impacts of drainage systems
isolation processes and procedures
types and operational parameters of drainage systems
types of drainage systems common to their industry and their possible issues
work plans and processes
Assessors must satisfy current standards for RTOs.