Assessor Resource

AHCLSC204A
Lay paving

Assessment tool

Version 1.0
Issue Date: May 2024


This unit applies to the process of laying modular paving in landscape projects and involves working under routine supervision with intermittent checking.

This unit covers the process of laying modular paving and defines the standard required to: set out the paving area; prepare the ground; lay bedding material; lay pavers to the specified pattern; clean up the site and dispose of waste.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

set out the paving area

prepare the ground

lay bedding material

lay pavers to the specified pattern

clean up the site and dispose of waste.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

read, interpret and apply information from a site plan that is to scale

calculate the amount of materials required, prepare the paving site, and follow a designated pattern

install modular pavers

sort soil and waste material from the excavation site in an environmentally aware and sensitive manner, such as sorting it into organic, inorganic, and recyclable piles

use literacy skills to follow sequenced written instructions and record information accurately and legibly

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification and seeking advice from supervisor

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to relate to people from a range of social, cultural and ethnic backgrounds and with a range of physical and mental abilities.

Required knowledge

OHS responsibilities of employees

OHS regulations regarding the erection of signs and barriers around the area to be paved

the environmental impact of soil disturbance when preparing to pave, and the environmental effects of altering water flow when installing new drainage systems

methods of disposing of soil and waste materials in order to minimise damage to the environment.

The range statement relates to the unit of competency as a whole.

Paving may include:

clay or brick paving bricks.

Permanent edge constraints may include:

concrete, timber or steel constraints

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Required workplace information is interpreted and confirmed with supervisor. 
Tools and equipment are prepared and used according to supervisor's instructions. 
The quantity and quality of materials are checked to ensure they conform to the requirements of the job. 
Occupational Health and Safety (OHS) hazards are identified, risks assessed and reported to the supervisor. 
Personal Protective Equipment (PPE) and clothing is selected, used and maintained. 
The area to be paved is marked out according to the site plan. 
The marked out area is checked with the supervisor for compliance with the site plan and OHS requirements, and adjusted where necessary. 
The reduced levels of the proposed paving area are calculated and pegged from the survey benchmark using the rise and fall method in a closed level run. 
The area is excavated to shape, depth and dimensions to sub base level according to minimal industry standards. 
The sub base is trimmed to the designated level and falls to ensure that the final level of paving can be achieved. 
Drainage systems are constructed as necessary according to the site plan. 
Base material is placed and compacted to the required finished level according to minimal industry standards. 
Bedding material is spread loosely over the area to ensure the designated bedding depth can be attained according to minimal industry standards. 
Screed rails are established to ensure the bedding course is maintained. 
Bedding material is levelled to the designated level and falls and in accordance with minimum industry standards. 
Grid string lines are set to required levels to ensure the designated pattern of the project is attained, and to maintain straight lines of components. 
Pavers are set out to the required dimensions and pattern according to the site plan. 
Whole pavers are laid and compacted to the established finish level. 
Pavers are marked, cut and fitted to accurately fill gaps in the pattern within tolerances nominated within the site plan. 
Permanent edge constraints are installed to prevent movement of pavers. 
Paving is swept thoroughly to produce a clean and flat surface free of debris. 
Sand is spread evenly of the paved area and compacted to the finished level. 
Soil and waste material from the site is disposed of or recycled to ensure minimal impact on the environment. 
All tools and equipment are cleaned and stored according to supervisors instructions. 

Forms

Assessment Cover Sheet

AHCLSC204A - Lay paving
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCLSC204A - Lay paving

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: