Assessor Resource

AHCMKH402
Design and fabricate milking equipment installations

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency describes the skills and knowledge required to design and fabricate milking equipment installations.

All work must be carried out to comply with workplace procedures, work health and safety, animal welfare and biosecurity legislation and codes, and sustainability practices.

This unit applies to individuals who take responsibility for their own work and provide and communicate solutions to a range of predictable and sometimes unpredictable problems.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare design and installation estimates

1.1 Determine facility design and installation estimates to suit the application

1.2 Document financial and physical resources that impact on the proposed works

1.3 Identify work health and safety issues that impact on the design and construction of the facility and installation, and incorporate risk controls in the design and construction planning

1.4 Determine manpower and other resources required and submit the tender

2. Plan installation

2.1 Complete contract for work including verification of material estimates and costings

2.2 Obtain relevant building and planning permits

2.3 Ensure site planning includes consideration of environmental issues, service connections and alternative power supplies

2.4 Plan required components to match the proposed installation and source from the original equipment manufacturer

2.5 Plan the installation to eliminate hazards to people and animals during milking, cleaning or service operations

3. Facilitate the completion of the installation

3.1 Carry out job scheduling with all relevant parties

3.2 Order and take delivery of physical and material resources

3.3 Coordinate the implementation of the milking machine installation

3.4 Establish areas of responsibility for all the project participants and provide full notification

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

prepare design and installation estimates

plan installation

facilitate the completion of the installation

implement work health and safety policies

The candidate must demonstrate knowledge of:

types, functions, cleaning, monitoring and maintenance of milking facilities and milking machine/equipment installations

requirements, resources, components and financial aspects of planning milking equipment installations for milking facilities and enterprises

requirements, resources, components and manpower for implementing installation of milking machine/equipment

relevant enterprise considerations for milking facilities and milking equipment installations

keys aspects and components of tender submissions and contracts for work

types of relevant approvals, authorities and permits required, and procedures to obtain these approvals, authorities and permits

relevant work health and safety requirements

Competency is to be assessed in the workplace and/or simulated environment that accurately reflects performance in a real workplace setting.

Assessors must satisfy current standards for RTOs.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare design and installation estimates

1.1 Determine facility design and installation estimates to suit the application

1.2 Document financial and physical resources that impact on the proposed works

1.3 Identify work health and safety issues that impact on the design and construction of the facility and installation, and incorporate risk controls in the design and construction planning

1.4 Determine manpower and other resources required and submit the tender

2. Plan installation

2.1 Complete contract for work including verification of material estimates and costings

2.2 Obtain relevant building and planning permits

2.3 Ensure site planning includes consideration of environmental issues, service connections and alternative power supplies

2.4 Plan required components to match the proposed installation and source from the original equipment manufacturer

2.5 Plan the installation to eliminate hazards to people and animals during milking, cleaning or service operations

3. Facilitate the completion of the installation

3.1 Carry out job scheduling with all relevant parties

3.2 Order and take delivery of physical and material resources

3.3 Coordinate the implementation of the milking machine installation

3.4 Establish areas of responsibility for all the project participants and provide full notification

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

prepare design and installation estimates

plan installation

facilitate the completion of the installation

implement work health and safety policies

The candidate must demonstrate knowledge of:

types, functions, cleaning, monitoring and maintenance of milking facilities and milking machine/equipment installations

requirements, resources, components and financial aspects of planning milking equipment installations for milking facilities and enterprises

requirements, resources, components and manpower for implementing installation of milking machine/equipment

relevant enterprise considerations for milking facilities and milking equipment installations

keys aspects and components of tender submissions and contracts for work

types of relevant approvals, authorities and permits required, and procedures to obtain these approvals, authorities and permits

relevant work health and safety requirements

Competency is to be assessed in the workplace and/or simulated environment that accurately reflects performance in a real workplace setting.

Assessors must satisfy current standards for RTOs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Determine facility design and installation estimates to suit the application 
Document financial and physical resources that impact on the proposed works 
Identify work health and safety issues that impact on the design and construction of the facility and installation, and incorporate risk controls in the design and construction planning 
Determine manpower and other resources required and submit the tender 
Complete contract for work including verification of material estimates and costings 
Obtain relevant building and planning permits 
Ensure site planning includes consideration of environmental issues, service connections and alternative power supplies 
Plan required components to match the proposed installation and source from the original equipment manufacturer 
Plan the installation to eliminate hazards to people and animals during milking, cleaning or service operations 
Carry out job scheduling with all relevant parties 
Order and take delivery of physical and material resources 
Coordinate the implementation of the milking machine installation 
Establish areas of responsibility for all the project participants and provide full notification 

Forms

Assessment Cover Sheet

AHCMKH402 - Design and fabricate milking equipment installations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCMKH402 - Design and fabricate milking equipment installations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date: