Assessor Resource
AHCSAW501A
Design control measures and structures
Assessment tool
Version 1.0
Issue Date: May 2024
This unit is likely to be carried out independently within enterprise guidelines.
This unit covers work functions associated with the formal engineering design of erosion and sediment control measures and structures including farm dams on land disturbing projects in both urban and rural environments and defines the standard required to: identify measures to be designed; apply design procedures; prepare specification schedule; cost and provide recommendations; collaborate with planner.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)