Assessor Resource

CPCCCA2003
Erect and dismantle formwork for footings and slabs on ground

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency specifies the skills and knowledge required to erect and dismantle formwork for basic slabs on ground, rebates to slabs on ground and steps to strip footings in residential and commercial sites.

It includes:

establishing required levels on site

constructing formwork using boxing materials such as timber, metal, masonry, fibre cement sheeting or reconstituted timber products

using fixings to contain wet poured concrete until it is completely cured

stripping the formwork and preparing and storing it for re-use.

This unit is designed for those working as a member of a team safely erecting and dismantling formwork for footings and slabs on ground.

It applies to workers in the construction industry. It involves working under supervision in a team environment.

No licensing, legislative, or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Review and clarify task to erect and dismantle formwork for footings and slabs on ground. 
Assess work site to determine scope of work. 
Review design of footing and/or slab on ground from job drawings and specifications, and check to make sure it is in accordance with legislation, regulations and codes of practice. 
Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies. 
Identify safety signage and barricade requirements. 
Review environmental requirements for the task in accordance with environmental plans and legislative requirements. 
Select plant, tools and equipment, check for serviceability and rectify or report any faults. 
Erect identified safety signage and barricades, and fit personal protective equipment (PPE). 
Set out formwork to requirements of drawings and specifications. 
Select fixings and fasteners. 
Construct and erect formwork shutters and/or edge boxing. 
Brace formwork support. 
Install block-outs and cast-in services to specified locations. 
Remove edge boxing and bracing/strutting support sequentially and safely. 
De-nail, clean and store or stack timber components safely for re-use or removal from site. 
Clean and oil steel components, then store or stack to manufacturers’ specifications. 
Discard damaged formwork components safely after stripping. 
Clear work area and dispose of, re-use or recycle materials in accordance with legislation, regulations, codes of practice and task requirements. 
Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications and workplace requirements. 

Forms

Assessment Cover Sheet

CPCCCA2003 - Erect and dismantle formwork for footings and slabs on ground
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCCA2003 - Erect and dismantle formwork for footings and slabs on ground

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent