Assessor Resource

CPCCCO3048
Construct tilt panels on site

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency specifies the skills and knowledge required to work in a team to set up, pour and place concrete tilt panels to form internal and external walls for building structures on residential, commercial or civil construction sites.

It includes on-site and prefabricated methods of panel construction used to construct internal and external walls of structures.

It applies to concreters working as members of a team with at least a moderate degree of autonomy. They would be expected to complete routine activities without close supervision.

Licensing, legislative, regulatory or certification requirements apply to this unit of competency in all states and territories except Tasmania. Relevant state and territory regulatory authorities should be consulted to confirm these requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Review and clarify task to construct tilt panels on site. 
Review design of tilt panel from job drawings and specifications, and check to make sure it is in accordance with legislation, regulations and codes of practice. 
Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies. 
Identify safety signage and barricade requirements. 
Review environmental requirements for the task in accordance with environmental plans and legislative requirements. 
Select plant, tools and equipment, check for serviceability and rectify or report any faults 
Calculate material quantity requirements. 
Acquire materials for the task and locate them safely ready for use. 
Erect identified safety signage and barricades, and fit personal protective equipment (PPE). 
Select a suitable area to construct casting bed in accordance with project requirements. 
Prepare the ground to a flat surface in preparation for casting bed. 
Place and finish casting bed to project requirements. 
Coat casting bed with bond breaker in accordance with product specifications. 
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE). 
Set out location and size of tilt panel to requirements of job drawings and specifications. 
Prepare, place and fix tilt panel edge formwork, and plumb and align to specifications. 
Apply bond breaker to casting bed face or casting form face of previous panel to ensure ease of panel separation, in accordance with manufacturer’s dose and quantity recommendations. 
Apply form release agent to formwork in accordance with specifications. 
Check reinforcement, accessories and cast-in fittings for conformity with design and engineering specifications. 
Position reinforcement, accessories and cast-in fittings in accordance with engineering drawings and specifications. 
Position tie and/or weld reinforcement in accordance with engineering drawings and specifications. 
Place concrete evenly and consolidate to specification using approved vibration method. 
Screed and finish concrete surface to specification ensuring cast-in fittings are clear. 
Apply curing process. 
Apply bond breaker to casting bed face of previous panel to ensure ease of panel separation. 
Strip edge formwork after final panel is cast, ensuring no damage to panels. 
Clear work area daily and dispose of, reuse or recycle materials in accordance with legislation, regulations, codes of practice and task requirements. 
Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ specifications and workplace requirements. 

Forms

Assessment Cover Sheet

CPCCCO3048 - Construct tilt panels on site
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCCO3048 - Construct tilt panels on site

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: