Assessor Resource

CPCPRE2003
Grout prefabricated concrete elements

Assessment tool

Version 1.0
Issue Date: May 2024


You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Review and clarify grouting task and accessibility to enable the grouting to be placed in accordance with the erection prefabricated design documentation and material data sheets. 
Review erection design documentation for task specifications and check to make sure they are in accordance with regulations, standards and codes of practice. 
Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies. 
Identify safety signage and barricade requirements. 
Review environmental requirements for the task in accordance with environmental plans and legislative requirements. 
Access plant, tools, equipment and materials required to carry out task. 
Locate the joints and confirm safety requirements, including working aloft, fall protection 
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE). 
Obtain plant, tools, equipment, check for serviceability and rectify or report any faults. 
Identify materials and associated quantities/measurements required for grouting according to specifications and material data sheets. 
Review the erection design documentation and the material data sheets and check if removal of shims or levelling packers are required after initial grouting has cured. 
Review the erection design documentation and the material data sheets to verify which gaps are to be grouted. 
Establish the volume of flowable grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency so as to be free flowing and bleed from grout breathers and/or flow tubes. 
Check that all grout tubes, breathers and areas to be grout filled are clear and free from debris, contaminants and/or loose materials. 
Check the grout mixture for the desired consistency and flow property and adjust accordingly in accordance with the erection design documentation and the material data sheets. 
 
 
 
 
 
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE). 
 
 
 
 
Check the erection design documentation and the material data sheets to confirm compliance with compressive and tensile strength grout requirements. 
Establish the volume of flowable grout required and mix in accordance with specifications and material data sheet to ensure it is the desired consistency so as to be free flowing and bleed from grout breathers and/or flow tubes. 
 
 
Ensure that all prefabricated concrete joint surfaces are prepared in accordance with the specifications and material data sheets. 
 
 
 
 
 
Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements. 
 

Forms

Assessment Cover Sheet

CPCPRE2003 - Grout prefabricated concrete elements
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCPRE2003 - Grout prefabricated concrete elements

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: