Assessor Resource

CPCPRE2004
Caulk prefabricated concrete elements

Assessment tool

Version 1.0
Issue Date: May 2024


You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Review the erection design documentation and construction drawings to clarify caulking task specifications. 
Review work health and safety (WHS) requirements for the task in accordance with safety plans and policies. 
Conduct working at heights risk assessment and follow appropriate WHS processes. 
Identify safety signage and barricade requirements. 
Review environmental requirements for the task in accordance with environmental plans and legislative requirements. 
Access tools, equipment and materials required to carry out task. 
Locate the joints and confirm safety requirements, including working aloft, fall protection, accessibility and drop zones. 
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE). 
Obtain plant, tools, equipment, check for serviceability and rectify or report any faults. 
Identify materials and associated quantities/measurements required for caulking according to specifications. 
 
 
 
 
 
Erect identified safety signage and barricade requirements, and fit personal protective equipment (PPE). 
 
 
 
 
 
 
Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements. 
 

Forms

Assessment Cover Sheet

CPCPRE2004 - Caulk prefabricated concrete elements
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCPRE2004 - Caulk prefabricated concrete elements

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: