List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions. |
1. | Prepare for geodetic survey. | 1.1. | Project specifications are analysed to determine geodetic survey and client requirements in consultation with appropriate persons. |
| 1.2. | Characteristics of operating environment and special equipment or resource requirements are identified according to organisational requirements. |
| 1.3. | Equipment is selected and checked according to manufacturer specifications to ensure correct operation and functionality according to manufacturer specifications. |
| 1.4. | Risk management strategies are devised and followed to ensure project complies with legal and statutory standards and organisational requirements. |
| | | |
2. | Plan geodetic survey. | 2.1. | Key activities and timelines are scheduled according to available resources, and project and organisational requirements. |
| 2.2. | Design is interpreted to identify required surveying data according to project requirements. |
| 2.3. | Relevant reference surface and projection plane are selected for geodetic components. |
| 2.4. | Existing survey control data is obtained and validated according to project and organisational requirements. |
| | | |
3. | Carry out geodetic surveying tasks. | 3.1. | Project management mechanisms are implemented to schedule, measure, record, monitor and report work progress according to organisational requirements. |
| 3.2. | Identified surveying components are measured according to project requirements and specifications. |
| 3.3. | Measured surveying data is reduced according to project requirements and specifications. |
| 3.4. | Measurements are validated and recorded according to project specifications and organisational requirements. |
| 3.5. | Discrepancies between specifications and actual activities are identified and resolved, and contingencies managed according to organisational requirements. |
| | | |
4. | Finalise geodetic survey. | 4.1. | Survey is finalised and checked for compliance with project and organisational requirements. |
| 4.2. | Appropriate persons are notified of survey results according to organisational requirements. |
| 4.3. | Survey documentation is completed and data archived according to project and organisational requirements. |
A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit. The person must also conduct a geodetic survey for two different projects.
While conducting the above geodetic surveys, the person must:
analyse standards, specifications and information, including plans and drawings to determine survey requirements
prepare for the survey by analysing specifications and operating environment to ensure adequate equipment and resources
carry out a precise global navigation satellite system (GNSS) traverse for survey control using two of the following pieces of equipment:
barometer
GNSS equipment
thermometer
identify and apply relevant geodetic coordinate systems and reference points to survey activities
measure and compute GNSS survey traverse components using GNSS equipment and appropriate software to aid geodetic calculations
perform calculations in a logical progression to solve geodetic surveying problems
use coordinate systems, including Map Grid of Australia (MGA) and Geocentric Datum of Australia (GDA) to manage surveying data
communicate clearly with clients and stakeholders to clarify and report survey information
comply with industry-accepted standards for validating accuracy of data and identifying errors and discrepancies
comply with organisational and legal requirements for:
completing records and documentation
recording, storing and filing data
using, checking and storing surveying equipment
working safely and using personal protective equipment (PPE)
plan and implement project management mechanisms to ensure the survey is completed within required timeframes and project complies with specifications and standards
plan and implement risk management and contingency strategies.
A person demonstrating competency in this unit must demonstrate knowledge of:
accuracy and precision requirements for geodetic surveying data
common terms used in geodetic surveying calculations
coordinate systems that are compatible with GNSS, including MGA and GDA
data reduction techniques
industry-accepted methods for validating data to identify errors and discrepancies
legislative, statutory and industry requirements and standards relating to work tasks
organisational policies and procedures relating to:
health and safety relating to survey activities
reporting and documentation
using and allocating resources
using the equipment specified in the performance evidence
project management techniques for scheduling, measuring and monitoring work progress and planning for risks and contingencies
reference surfaces, projection planes and coordinate systems for geodetic components
industry-accepted techniques for survey control
standard survey plan design and presentation conventions.
The following must be present and available to learners during assessment activities:
equipment:
as specified in the performance evidence, including PPE
specifications:
organisational policies, procedures and documentation relating to work health and safety
survey specifications, including relevant plans and drawings
relationships with team members and supervisor:
working in a team.
Timeframe:
as specified by project requirements.
Assessor requirements
As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment.