Assessor Resource
FPPEPG320A
Manage a power generation system startup
Assessment tool
Version 1.0
Issue Date: May 2024
This unit applies to operators who manage a power generation system startup in the pulp and paper industry. This work typically involves complex integrated equipment and continuous operations
This unit generally applies to those who:
conduct local inspections and pre-operational safety checks, and
initiate startup procedures
to meet safety, quality and productivity requirements
It does not include co-ordinating power generation system shutdowns, monitoring and controlling power generation systems or troubleshooting and rectifying power generation systems
This unit describes the outcomes required to manage a power generation system startup in the pulp and paper industry
General legislation, regulatory, licensing and certification requirements applicable to this unit are detailed in the range statement
Specific high risk licensing requirements for this unit may be applicable and are to be met separately and prior to the achievement of this unit
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)