This unit of competency describes the skills and knowledge required to construct prototypes and samples of timber structures in a production setting according to established plans, drawings or other specifications for testing the viability of timber construction methods.

The unit applies to individuals who work as timber fabricators, supervisors and designers of timber structures. They generally demonstrate autonomy, judgement and limited responsibility in known or changing contexts and within established parameters.

All work must be carried out to comply with workplace procedures, according to state/territory health and safety regulations, legislation and standards that apply to the workplace.

No occupational licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Review the purpose for prototype or sample, work order, prototype construction plans, workplace health and safety requirements, environmental protection practices and emergency procedures and, where required, clarify requirements with appropriate personnel 
Identify and report hazards and use personal protective equipment according to workplace requirements and health and safety legislation to maintain safe work practices 
Obtain the type and quantity of material to be assembled and hardware according to prototype construction plan and specifications 
Select appropriate tools and equipment and check for operational effectiveness according to manufacturer recommendations 
Plan and document stages of the prototype construction process 
Select and prepare set-up jigs required for prototype construction 
Select timber components, check for compatibility with specifications and cut according to the prototype or sample plans 
Position and clamp components in jigs ready for joining with allowable faults, joins and grain according to construction standards and grading rules 
Identify defective components, incorrect timber cuts and off-cuts and dispose of or recycle according to environmental protection practices 
Staple components to maintain temporary alignment during assembly 
Follow prototype construction plan throughout the assembly and conduct checks at designated points 
Position and install hardware on joints to prototype specifications 
Nail or staple temporary bracing to the product according to construction standards 
Identify required modifications to designs and plans, and document and follow recommended changes 
Correct construction faults according to recommendations 
Review prototype or sample for the effectiveness of purpose and efficiency of timber construction methods 
Record prototype or sample construction processes, problems and recommendations for change, and report to appropriate personnel 
Store temporary bracing, prototypes and samples and dispose of when not required according to environmental protection practices 

Forms

Assessment Cover Sheet

FWPTMM4208 - Construct prototypes and samples for timber structures
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

FWPTMM4208 - Construct prototypes and samples for timber structures

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: