Assessor Resource

FWPTMM5210
Verify compliance and conformance of prefabricated timber building systems during manufacture

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency describes the skills and knowledge required to verify physical performance and compliance liability of panelised or modular prefabricated timber building systems and components during off-site manufacturing to ensure that delivered product matches the design specifications and regulatory obligations.

The unit applies to individuals who work as compliance officers, supervisors or managers in a prefabricated timber building systems manufacturing plant. Such individuals demonstrate deep knowledge in a specific technical area and analyse, design and communicate solutions to sometimes complex problems.

All work must be carried out to comply with workplace procedures, according to state/territory health and safety regulations, legislation and standards that apply to the workplace.

No occupational licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain and confirm production schedule, design documentation, plans, requirements, workplace health and safety requirements and established procedures relevant to the off-site manufacturing order 
Identify certification and compliance requirements for prefabricated timber building system, components, materials and in-built services from design specifications or appropriate codes and standards 
Identify tolerances for material quality, physical dimensions and service connections from design specifications 
Prioritise and sequence verification work according to production schedules for completion within established timeframes 
Consult appropriate personnel, testers and certifiers to coordinate verification work efficiently 
Verify that connections, structural components and physical dimensions of timber framing structure are appropriate for grade, thickness, tolerances and choice of materials according to minimum specified design requirements before installation services 
Verify that provisions have been made for components including hydraulics, electrical and heating, ventilation, air conditioningmechanical services and plumbing 
Ensure that partition/walls or floor elements are assembled according to design specifications, local codes and standards for minimising or eliminating continuity issues in the final, installed prefabricated timber building system 
Verify regulated components including fire-rated walls or fire protection systems for conformance with performance requirements of relevant codes, standards and design specifications, and ensure that damage is minimised within the manufacturing environment 
Ensure that any variations of material properties or system component decided during the off-site manufacture meet performance, design specification, relevant codes and standards 
Ensure that off-site installation of services conform to the appropriate local standards and are approved before delivery to the construction site 
Verify completed prefabricated timber building system to ensure that delivered product is safe for manual handling and meets design specifications and regulatory requirements 
Identify and report non-compliance and non-conformance issues according to established procedures 
Make recommendations for rectifying compliance and conformance issues according to established procedures 
Document completion of verification work according to established procedures 

Forms

Assessment Cover Sheet

FWPTMM5210 - Verify compliance and conformance of prefabricated timber building systems during manufacture
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

FWPTMM5210 - Verify compliance and conformance of prefabricated timber building systems during manufacture

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: