List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Select the software management tools | 1.1 Determine the software development methodology to be used 1.2 Determine the project management software to be used 1.3 Determine the source-control system to manage the source code and to handle conflicts 1.4 Determine the collaboration software to be used |
2. Use the software management tools | 2.1 Create a project plan, according to the software requirement specifications 2.2 Define the source-control procedures 2.3 Create a collaboration environment |
3. Monitor the use of software management tools | 3.1 Monitor, and adjust, the project plan to maintain progress according to the project plan 3.2 Ensure that the code is correctly entered into the source-control system 3.3 Monitor the collaboration environment, and resolve issues where required |
Evidence of the ability to:
use software management tools to manage the development of a system to specification
select the software development methodology, project management software, source-control system, and collaboration software
create, monitor and adjust a project plan, according to the requirement specifications
define source-control procedures, and ensure the correct entries into the system
create, monitor, and resolve issues in a collaborative environment.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
outline the basic principles of project management
describe the key features of the software development life cycle (SDLC)
describe the importance of software specifications
identify the methods and importance of version control.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the programming and software development industry, and include access to:
the internet
project management software
source-control software
specific tools and licences, depending on the particular platform.
Assessors must satisfy NVR/AQTF assessor requirements.