Assessor Resource

ICTTEN322
Provide infrastructure for telecommunications network customer equipment

Assessment tool

Version 1.0
Issue Date: May 2024


This unit describes the skills and knowledge required to install supporting infrastructure for telecommunications equipment and associated hardware, including access equipment and associated media, power and monitoring equipment, and alarm systems.

It applies to field officers, installation technicians or technical supervisors working for contractors or other service providers who work on switching, transmission, radio networks and various transmission paths including cable, optical fibre, radio, microwave and satellite.

No licensing, legislative or certification requirements apply to this unit at the time of publication. However, technical work in telecommunications must only be done on extra-low voltage power levels otherwise it breaches the electrical licensing laws in Australia set within AS/NZS 3000:2018 Electrical installations known as the Australian/New Zealand Wiring Rules.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Notify customer to arrange site access and obtain installation plan and specifications 
Conduct site survey to verify infrastructure installation requirements can be met 
Identify site hazards and notify appropriate personnel to make site safe 
Notify customer of alterations required to installation design and make recommendations for possible solutions 
Obtain approval for alterations and update installation plan as required 
Develop installation activity schedule to minimise disruption to the workplace and according to relevant regulations and standards 
Obtain material supplies, safety equipment, resources, tools and test equipment to be available as required for installation for safe work practice 
Prepare for given work according to work health and safety (WHS) and environmental requirements 
Fit-out telecommunications closet, cabinet or equipment room to house equipment, distributors and AC/DC power systems according to design plans, manufacturer specifications, and safety and electrical standards 
Build cable support systems for signal, data cabling and optical cables, including entrance facilities, intra-, and inter-building facilities according to plan and specifications 
Organise installation of mains AC electrical power cabling infrastructure according to plan and specifications 
Install cable distribution frames according to plan and manufacturers specifications 
Install protective earthing to metal infrastructures or gas arrestors according to specifications or design 
Install batteries, rectifiers and uninterrupted power supply (UPS) systems as required by specifications or design and connect according to manufacturer and WHS requirements 
Test and monitor UPS battery discharge levels and obtain replacement batteries under warranty as required 
Identify and rectify faults where possible or escalate according to enterprise policy 
Attach infrastructure labels and designations according to enterprise requirements 
Complete inspection sheets and declare asset ready for customer sign-off documentation 
Clean-up site 
Notify customer and obtain sign-off 

Forms

Assessment Cover Sheet

ICTTEN322 - Provide infrastructure for telecommunications network customer equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTTEN322 - Provide infrastructure for telecommunications network customer equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: