List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Confirm and update schematic drawings and specifications | 1.1 Review existing specifications and drawings for completeness 1.2 Prepare additional drawings and specifications for installation if required 1.3 Compare drawings with design brief to confirm requirements 1.4 Confirm all cable and locations with carrier |
2. Price labour, materials and other relevant items and establish availability | 2.1 Obtain quotations and delivery dates from suppliers 2.2 Use schedule of rates for scheduled items 2.3 Obtain quotes and supply dates for all non-scheduled items or activities 2.4 Estimate labour costs based on company practices 2.5 Check pricing documentation to ensure supply proposal matches carrier specification for material, quality and performance |
3. Estimate labour, materials and other relevant item requirements | 3.1 Prepare estimations allowing for contingencies during installation and relevant legislation, codes, regulations and standards 3.2 Ensure estimates will return a profit on installation where appropriate |
4. Prepare and confirm quote with carrier | 4.1 Prepare a project installation quote that meets carrier requirements 4.2 Negotiate changes and variations to meet carrier and company needs |
5. Establish carrier’s financial arrangements | 5.1 Obtain carrier's approval for project design drawings and estimate 5.2 Issue design drawings and specifications for authority to construct |
Evidence of ability to:
prepare detailed estimates
update schematic drawings and specifications for telecommunications equipment installations including:
materials
labour costs
negotiate material availability and pricing for carrier equipment and network installations with contractors
document detailed quotes for installations that allow for changes and variations
prepare and confirm quote and financial arrangements with carrier.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
compare and contrast features of carrier telecommunications equipment
identify and summarise application of legislation, codes of practice and other formal agreements that impact the work activity
analyse and document the manufacturer's requirements for safe operation of equipment
describe processes and techniques required to prepare plans, estimate and quote for installations
identify and apply specific work health and safety (WHS) requirements relating to design and site conditions
identify and remedy typical issues and challenges of dealing with carriers
explore allocations to be included in the design specifications and quotation
determine common contingencies to consider in a specification or quotation.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the telecommunications networks engineering field of work and include access to:
special purpose tools, equipment and materials
sites on which estimates and quotes may be conducted
relevant databases and licensing requirements
site-related documentation.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.