Implement planned network changes with minimal impact to the customer

Assessment tool

Version 1.0
Issue Date: May 2024


Field officers, technicians or technical supervisors from service providers, asset owners and contractors who upgrade or reconfigure new and existing equipment apply the skills and knowledge in this unit.

This unit applies to specialist staff with high level technical skills and appropriate authority to coordinate the activities of maintenance personnel. It addresses compliance issues associated with service level agreements.

This unit describes the performance outcomes, skills and knowledge required to effectively upgrade network equipment, increase network capacity, install new network elements and change existing network elements with minimal impact to the customer. It involves the control of planned routine maintenance activities on the network.

No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to:

evaluate planned network changes, including impact on customer

develop network engineering strategies to manage outages

implement network changes

conduct integration testing, analyse results and rectify faults

enable full functionality of network changes.

Context of and specific resources for assessment

Assessment must ensure:

sites where network changes may be conducted

use of testing equipment currently used in industry

systems manuals, specifications and enterprise policy.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct observation of the candidate implementing network changes

review of network changes plan prepared by the candidate outlining network engineering strategies to manage outages

review of test results and documentation completed by the candidate

oral or written questioning to assess required knowledge.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:

ICTTEN6044A Coordinate fault rectification and restoration of service following network outages.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

analytical skills to asses network changes and make recommendations

communication skills to interact with enterprise personnel, customers and other contractors keeping a customer focus and consideration of customer needs

literacy skills to read, interpret and use equipment and system manuals and specifications and relevant enterprise policy and documentation

planning and organisational skills to coordinate all work groups associated with network change

PC skills to load software and hardware

problem solving skills to account for unexpected faults or equipment incompatibilities

research skills to gain and maintain relevant and current technical product knowledge

safety awareness skills to adhere to all related OHS requirements and work practices

technical skills to:

conduct performance testing

correctly handle, connect and calibrate test equipment

interpret test results, diagnose and rectify faults

perform integration testing

Required knowledge

compatibility and interoperability of system types

factors affecting network stability

hardware

internet protocol (IP) based networks

legislation and licensing relevant to work activity

optical networks

quality assurance procedures

software

test equipment types suitable for tests to be made

types of customer networks

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant legislation, codes, regulations and standards may relate to:

Australian Communications Industry Forum (ACIF) standards and codes

AS Communications Cabling Manual (CCM) Volume 1

AS/NZS 3000:2007

AS/NZS 3080:2003

AS/NZS 3084:2003

AS/NZS 3085.1:2004

AS/NZS IEC 61935.1:2006

AS/NZS IEC 61935.2:2006

AS/NZS ISO/IEC 14763.3:2007

AS/NZS ISO/IEC 15018:2005

AS/NZS ISO/IEC 24702:2007

Australian building codes and regulations

cabling security codes and regulations

compliance with appropriate Australian Communications and Media Authority (ACMA) technical standard requirements for underground, aerial, Category 5, 6, 6A, 7 or 7A, and unshielded twisted pairs (UTP)

Environmental Protection Acts

fire regulations

noise abatement and heritage legislation

OHS

relevant international standards

technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006

Trade Practices Act.

Work order may include:

authority to proceed with change to the network

list of activities to be undertaken

schedule of activities.

Relevant personnel may include:

carrier or service provider staff

electrical contractor

equipment manufacturer

equipment supplier

external customer

on site operation staff.

Likely effects may include:

congestion

drop out

excessive latency

limited coverage

loss of coverage

loss of service

poor grade of service (GoS)

poor signal quality

routing problems.

Network may include:

cellular mobile networks

data and voice

IP network

national wide area networks (WAN)

optical dense wavelength division multiplexing (DWDM) networks

public switched telephone network (PSTN).

Impact may include:

disruption of service to residential customers

intermittent performance

loss of service and revenue to an enterprise.

Customers may include:

building owner

communications consultant

contractor to a major supplier

end users

equipment owner

householder

operations staff.

Network engineering strategies may include:

provision of redundant path

rerouting of traffic

supply of temporary equipment to maintain minimal services.

Outages may include:

loss of service to customers due to a network disruption

planned outage in the case of network upgrade

unplanned outage in relation to fault.

Network Operations Centre may include:

engineering unit within a carrier responsible for:

controlling the network

coordinating repairs or changes to the network

monitoring the network

performing diagnostic tests.

Enterprise practice may include:

procedures for implementing installation

procedures for implementing maintenance

reporting tasks.

OHS and environmental requirements may relate to:

decommissioning and isolating worksite and lines prior to commencement

gas and other hazard detection equipment

identifying other services, including power and gas

safety equipment:

flashing lights

safety barriers

trench guards

warning signs and tapes

witches hats

safe working practices, such as the safe use and handling of:

asbestos

chemicals

materials

tools and equipment

work platforms

special access requirements

suitable light and ventilation

environmental considerations:

clean-up protection

noise, dust and clean-up management

stormwater protection

waste management.

Customer traffic may include:

analog or digital forms of:

data

image

voice.

Integration testing may include:

compatibility

interface units

interoperability.

Performance test may include:

bandwidth

blocking

call rate

congestion

distortion

drop out rate

functionality

interference

latency

network tests

optical transmission tests

packet loss rate

quality of service (QoS)

radio transmission test

recovery rate

redundancy

signal to noise ratio

switching tests

transmission tests

transmission tests

transmitted power measurements

upload and download rate.

Manufacturer's specifications may include:

electrical

environmental parameters

mechanical

regulatory.

Acceptance testing may include:

testing equipment following major upgrade

testing newly installed equipment.

Escalate may include:

greater involvement from the NOC specialist personnel

requesting vendor specialist technical support.

Quality assurance may include:

acting on logs, reports and other data to guide ongoing quality improvements

reporting on installation or maintenance activities

updating logs.

Network stability may include:

alarm monitoring

congestion activity report

fault incidence report

network management report

traffic flow measurements.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain relevant legislation, codes, regulations and standards for compliance when conducting work 
Evaluate work order with relevant personnel and identify the likely effects on the network and impact on customers of the planned changes 
Develop network engineering strategies including management of outages with involvement of the network operations centre (NOC) 
Prepare and produce a network changes plan for approval according to enterprise practice 
Implement network changes according to network engineering strategies following occupational health and safety (OHS) and environmental requirements with minimal impact to customer traffic 
Conduct integration testing of newly installed equipment to ensure interoperability with existing equipment and network 
Conduct performance test to assess the network changes as stated in manufacturer'sspecifications and enterprise acceptance testing procedures 
Analyse test results and rectify problems or escalate according to enterprise procedures 
Initiate quality assurance procedures to ensure confidence in quality of processes according to enterprise policy 
Prepare reports for the appropriate area within the enterprise 
Monitor network stability prior to connecting customer traffic and take action to rectify any problems 
Enable full functionality of network changes to customer according to the network changes plan and monitor network to ensure continued stability 
Prepare appropriate documentation according to enterprise requirements 
Use monitoring data to evaluate the performance of the network changes and impact to customers according to network engineering strategies and customer requirements 
Document the implementation of the planned network changes and recommend any further improvements as part of the enterprise's quality assurance system 

Forms

Assessment Cover Sheet

ICTTEN6045A - Implement planned network changes with minimal impact to the customer
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTTEN6045A - Implement planned network changes with minimal impact to the customer

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent