MEM04007
Pour molten metal

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency defines the skills and knowledge required to manually pour molten metal as part of metal casting and moulding processes.

Where the selection and use of engineering measuring equipment is required unit MEM12023 Perform engineering measurements should also be selected.

Where the selection and use of tools is required unit MEM18001 Use hand tools and unit MEM18002 Use power tools/hand held operations, should also be selected as appropriate.

Where lifting and moving of ladles requires the use of overhead cranes, applicable units should also be selected.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Band: A

Unit Weight: 4

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Ladle includes one (1) or more of the following:

lip pour

tea pot

bottom pour

barrel

bull ladles of varying capacity

Additives include one (1) or more of the following:

alloys

inoculants

spheroidisers

coagulants

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Inform personnel in the immediate area of the metal pour that pour is to take place 
Pour metal safely to specification 
Pour metal at an appropriate and continuous rate 
Pour a test bar as required 
Follow standard operating procedures (SOPs) 
 
 
 
Select equipment as required 
 
 
 
 
 
Check safety clips in accordance with safety procedures 
 
 
Remove slag and/or dross where necessary 
 
Inform personnel in the immediate area of the metal pour that pour is to take place 
 
 
 
 
 

Forms

Assessment Cover Sheet

MEM04007 - Pour molten metal
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM04007 - Pour molten metal

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: