Assessor Resource

MEM07033
Operate and monitor basic boiler

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency defines the skills and knowledge required to perform start-up, take-over/handover, monitor, shutdown and storage of a basic boiler used for all purposes, including the generation of steam.

All work is carried out to applicable state/territory and national work health and safety (WHS) legislation, standards and codes of practice.

Where the selection and use of engineering measurement is required unit MEM12023 Perform engineering measurements should also be selected.

Where the selection and use of tools is required unit MEM18001 Use hand tools and unit MEM18002 Use power tools/hand held operations, as appropriate should also be selected.

Some jurisdictions may require the holder of this unit to be licensed or certified and users should check with the relevant authorities.

Band: A

Unit Weight: 6

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, accessibility of the item, and local industry and regional contexts) are included.

Pre-operational checks include one or more of the following:

feed water supply

boiler water level

fuel supply/heat source

boiler valves - their operation and position

combustion air supply

combustion equipment

Boilers include the following:

single fixed combustion air supply, non-modulating single heat source and fixed firing rate

Hazards include one (1) or more of the following:

chemical

thermal

manual handling

guarding of machinery

illumination of work area

rubbish and combustibles

leakage of steam and fuel

Monitor includes one (1) or more of the following:

steam pressure

flame and combustion conditions

feed system and condensate returns

fuel system

water level

combustion management system

water management system

boiler and steam manifold fittings

soot blowers

Handover includes the following:

previous load requirements

maintenance issue, including equipment isolated for maintenance

operational incidences

completing/reading operating log

general inspection of boiler to detect any defects

accept responsibility of boiler

noted equipment malfunctions

required equipment tests

Storage mode includes one (1) or more of the following:

wet

dry

open condition

closed condition

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Follow standard operating procedures (SOPs) 
 
 
 
Undertake pre-operational checks of boiler to plant operating procedures 
 
Identify hazards and potential hazards and report according to SOPs 
 
Start boiler and bring online safely, consistent with workplace procedures and production requirements 
 
 
Operate boiler and monitor consistent with production and safety requirements 
 
 
 
Shut down boiler for internal inspection 
 
Identify manufacturers’ recommendations and workplace procedures required for shutdown storage mode 
 

Forms

Assessment Cover Sheet

MEM07033 - Operate and monitor basic boiler
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM07033 - Operate and monitor basic boiler

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: