Assessor Resource

MEM23146
Contribute to the design of industrial refrigeration systems

Assessment tool

Version 1.0
Issue Date: May 2024


You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain and implement work health and safety (WHS) and environmental requirements for the work area 
Determine design requirements from client requirements, job specifications, briefings and/or discussions with appropriate personnel 
Identify and interpret relevant codes and standards 
Consult with appropriate personnel to ensure that work is coordinated effectively with others 
Obtain equipment and resources needed for the task in accordance with organisational procedures and check for correct operation and safety 
Select the most suitable design for an industrial refrigeration system to meet the specified requirements 
Plan design development work to meet scheduled timelines 
Check system design draft for compliance with the design brief, regulatory requirements and environmental standards 
Determine fulfilment of required capacity under full and partial load conditions using appropriate resources 
Verify final design using organisational procedures for compliance and regulatory requirements 
Document final system design for client approval, using appropriate equipment to industry standards 

Forms

Assessment Cover Sheet

MEM23146 - Contribute to the design of industrial refrigeration systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM23146 - Contribute to the design of industrial refrigeration systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: