Assessor Resource

MEM23151
Commission and optimise performance of HVACR systems

Assessment tool

Version 1.0
Issue Date: May 2024


You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain and implement work health and safety (WHS) and environmental requirements for the work area 
Determine system operating parameters by reviewing system specifications and component technical data 
Identify correct building codes and local government regulations using appropriate resources 
Prepare industry standard report on system performance levels using organisational procedures 
Consult appropriate personnel are to ensure the work is coordinated effectively with others involved on the work site 
Obtain equipment, resources and testing devices needed for the work in accordance with organisational procedures 
Set up and connect testing and measuring devices appropriately for task and to manufacturer specifications 
Measure and adjust equipment components and controls as required 
Undertake required measurements and tests and analyse results to provide optimum system performance in accordance with system specifications and regulatory requirements 
Provide solutions to unplanned situations consistent with organisational procedures 
Ensure commissioning is carried out efficiently without waste of materials or damage to equipment and surroundings 
Verify that plant and equipment are operating to specification 
Document adjustment settings and notify appropriate personnel in accordance with organisational procedures 

Forms

Assessment Cover Sheet

MEM23151 - Commission and optimise performance of HVACR systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM23151 - Commission and optimise performance of HVACR systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: