Assessor Resource

MEM25002
Form and integrate fibre-reinforced structures

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency defines the skills and knowledge required to apply, form and integrate fibre-reinforced components using manual and mechanical methods in marine vessel and aircraft construction applications.

It applies to component construction carried out for mould installation, and application and forming operations conducted within a mould or over a former assembly using a variety of glass reinforcements and other fibres.

Where mark off/out skills is required unit MEM12007 Mark off/out structural fabrications and shapes should also be selected.

Where straightforward application of fibre-reinforced materials and no forming or integrating is required unit MEM25001 Apply fibre-reinforced materials should be selected.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Band: A

Unit Weight: 4

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This field allows for different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included.

Application and forming operations include one (1) or more of the following:

lay-up practices

post-curing practices

core materials for stiffening application

sheathing applications using resins, adhesives, sealants and fillers

vacuum bagging techniques, where applicable

Products/components constructed include one (1) or more of the following:

hull

deck

superstructures

bulkhead and partitions

transverse and longitudinal framing

engine beds

tanks

Materials include one (1) or more of the following:

types of laminating resins

hardeners

releasing agents

pigments

fillers

variety of glass reinforcements and other fibres

stiffening materials, including:

foams

core mat

Tools and equipment include one (1) or more of the following:

brushes and rollers

metal rollers

gel coat

resin depositors

vacuum bagging equipment

hand and power tools

workshop machinery

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Select relevant materials for component construction 
Select relevant drawings and templates 
Form components to specifications 
Ensure component sizing matches the appropriate template 
Determine integration requirements, materials fixing/bonding methods and mixing practices from job specifications and manufacturer specifications 
Set up and adjust equipment ready for operation 
Fix/bond components in accordance with job requirements and specifications 
Form/shape reinforcement materials to specifications 
Prepare component for encapsulation process 
Clean excess bonding material and dispose of waste following SOPs 
Follow standard operating procedures (SOPs) 
 
 
Select relevant materials for component construction 
 
 
Determine integration requirements, materials fixing/bonding methods and mixing practices from job specifications and manufacturer specifications 
 
 
 
 
 
Select post-curing method to suit job application 
 
 
 

Forms

Assessment Cover Sheet

MEM25002 - Form and integrate fibre-reinforced structures
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MEM25002 - Form and integrate fibre-reinforced structures

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: