- MSACMT281A - Contribute to the application of a proactive maintenance strategy
Assessor Resource
MSACMT281A
Contribute to the application of a proactive maintenance strategy
Assessment tool
Version 1.0
Issue Date: June 2024
In a typical scenario, an organisation is following a predictive, preventative or reliability centred maintenance strategy and this requires commitment from all employees. The employee should 'own' their equipment/plant and take an active part in the implementation of the strategy within the scope of their authority.
This unit requires the application of skills associated with accessing and maintaining equipment/plant documentation, It also requires problem solving and initiative and enterprise to continually monitor and maintain operational performance of equipment/plant used in work role.
This unit covers the knowledge and skills required to make a positive contribution to proactive maintenance strategies which include things like plant uptime and Overall Equipment Efficiency (OEE).
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)
Employability Skills
This unit contains employability skills.
Evidence Required
List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package. | |
Overview of assessment requirements | The employee should 'own' their plant/equipment and take a lead role in ensuring that it is always operating in peak condition and with high and increasing OEE. |
What are the specific resource requirements for this unit? | Access to a plant using a proactive maintenance strategy. |
What critical aspects of evidence are required to demonstrate competency in this unit? | There should be evidence of deviations recognised and appropriate solutions implemented. |
In what context should assessment occur? | Assessment needs to occur in an organisation using a predictive maintenance strategy. |
Are there any other units which could or should be assessed with this unit or which relate directly to this unit? | This unit may be assessed concurrently with other units dealing with maintenance. This unit is related to: MSACMT280A Undertake root cause analysis which is one of the analysis tools, and also to MSACMT481A Undertake proactive maintenance analyses,and MSACMT681A Develop a proactive maintenance strategy which cover the intermediate and high skill levels respectively. |
What method of assessment should apply? | Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment. Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit. The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace. The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment. |
What evidence is required for demonstration of consistent performance? | Evidence should be required from a range of activities indicating that the maintenance and monitoring elements are a routine part of the job and that the identification of patterns and taking action has occurred in a range of situations. |
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
| |
Required skills | |
mathematical literacy analysis problem solving communication | |
Required knowledge | |
normal behaviour of the equipment/plant indicators of abnormal performance principles of operation sufficient to recognise problems and propose solutions appropriate cleaning and adjusting for the equipment/plant/area as required by procedures |
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. | ||
Uptime | Uptime refers to the overall availability of the plant - it is the inverse of downtime or the unavailability of the plant. Ideal uptime is 100%. | |
Overall Equipment Efficiency (OEE) | Overall Equipment Efficiency (OEE) is the combination of the main factors causing loss of productive capacity from equipment/plant and is: OEE = availability x performance x quality rate where: availability takes into account losses due to breakdown, set up and adjustments performance takes into account losses due to minor stoppages, reduced speed and idling quality rate takes into account t losses due to rejects, re-works and start up waste. | |
Procedures | Procedures include all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, verbal, computer based or in some other form. For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Good Manufacturing Practice (GMP), Responsible Care) and government regulations. |
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice | Yes | No | Comments/feedback |
---|---|---|---|
Keep equipment/plant within area of responsibility clean | |||
Ensure equipment/plant is serviced and adjusted as required in accordance with procedures and own level of responsibility | |||
Access manufacturer manuals/specifications where required to expand knowledge on the maintenance of equipment/plant | |||
Access and update documentation on equipment/plant operation and maintenance as appropriate to workplace procedures | |||
Regularly check key conditions of the equipment/plant as defined in the procedures | |||
Regularly check equipment/plant Overall Equipment Efficiency (OEE) | |||
Note any deviation from conditions specified in procedures | |||
Identify any previous occurrences of this deviation | |||
Identify any previous occurrences of a deviation | |||
Identify any related deviations which have occurred | |||
Identify any unusual occurrence which may be related to a deviation | |||
Liaise with relevant people regarding the deviation and the solution | |||
Implement solution/assist with the implementation of the solution as appropriate |
Forms
Assessment Cover Sheet
MSACMT281A - Contribute to the application of a proactive maintenance strategy
Assessment task 1: [title]
Student name:
Student ID:
I declare that the assessment tasks submitted for this unit are my own work.
Student signature:
Result: Competent Not yet competent
Feedback to student
Assessor name:
Signature:
Date:
Assessment Record Sheet
MSACMT281A - Contribute to the application of a proactive maintenance strategy
Student name:
Student ID:
Assessment task 1: [title] Result: Competent Not yet competent
(add lines for each task)
Feedback to student:
Overall assessment result: Competent Not yet competent
Assessor name:
Signature:
Date:
Student signature:
Date: