Assessor Resource

MSFFL3078
Install direct stick timber flooring

Assessment tool

Version 1.0
Issue Date: May 2024


This unit describes the skills and knowledge required to set out, cut, lay and fix pre-finished, engineered or solid direct stick timber flooring within a space to a hard underlay base or subfloor.

This unit applies to flooring technicians installing timber flooring in accordance with pre-determined work orders.

Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Industry standards and codes of practice within Australia must also be applied. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify and follow work health and safety, legislative and organisational requirements 
Correctly identify work requirements and process from review of documentation 
Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations 
Select underlays adhesives, trims and accessories based on job requirements 
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Plan sequence of work, including the starting point, to ensure efficiency and quality of installation. 
Check flooring against work order and acclimatise in accordance with manufacturer recommendations 
Organise pre-finished, engineered or direct stick timber flooring for fixing and use in accordance with relevant safety management requirements 
Remove or undercut skirting boards or cover trims, if required, and store for re-fitting or send for machining in accordance with job requirements 
Prepare required adhesives and accessories for use in accordance with manufacturer instructions 
Establish working lines and starting point 
Follow instructions and sequence for laying and fixing 
Lay appropriate underlay in accordance with manufacturer recommendations 
Lay out flooring to meet directional sequence, pattern match, specification requirements, and minimising waste and joins 
Maximise the aesthetics of materials, where appropriate, by matching grains and colours 
Accurately and clearly mark flooring for cutting 
Cut timber flooring to length and size for final laying ensuring minimum waste. 
Organise materials for fixing and use in accordance with safety management requirements 
Prepare required adhesives and accessories for use 
Use fixing methods and equipment in accordance with manufacturer recommendations 
Allow appropriate field and perimeter expansion joints 
Fit and/or re-fit skirting boards or cover trims and finish in accordance with job requirements 
Inspect finished job and rectify any imperfections in accordance with workplace procedures 
Store and recycle unused materials in accordance with workplace procedures 
Check, clean and store tools and equipment in accordance with workplace procedures 
Clean work area and dispose of rubbish safely 
Accurately complete required workplace documentation 
Identify and follow work health and safety, legislative and organisational requirements 
Correctly identify work requirements and process from review of documentation 
Confirm subfloor suitability for installation consistent with Australian Standards and manufacturer recommendations 
Select underlays adhesives, trims and accessories based on job requirements 
Select and check tools, equipment and materials prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition 
Plan sequence of work, including the starting point, to ensure efficiency and quality of installation. 

Forms

Assessment Cover Sheet

MSFFL3078 - Install direct stick timber flooring
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFFL3078 - Install direct stick timber flooring

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: