Assessor Resource

MSFGG4016
Plan and coordinate commercial glazing installations

Assessment tool

Version 1.0
Issue Date: May 2024


This unit describes the skills and knowledge required to interpret contract documentation, develop a project schedule and coordinate all resources required for the complete glass and glazing installation process in accordance with quality requirements. It includes the requirement for establishing and maintaining communication with a diverse range of site personnel.

This unit applies to individuals in glass and glazing enterprises who perform specialist or leadership functions.

Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking glass and glazing work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify key components and conditions of work from analysis of contract documentation 
Confirm glass installation specifications and timing through consultation with principal contractors and architects and/or engineers for the construction 
Determine and document internal and external human, physical and financial resources through review of documentation 
Identify and accurately document site requirements and limitations 
Sequence installation operations and allocate responsibilities within a project schedule 
Define critical path of the installation from project schedule 
Organise resources and schedule from internal or external supply sources and confirm details in writing 
Develop installation site and safety plans for coordinating with other building trades and contractors 
Obtain permits within the required timeframe 
Monitor project timeframes and adjust to account for other construction activity scheduling 
Check and supervise on-site plant delivery and placement against work plan, safety and site requirements 
Schedule and monitor on-site human resource requirements in accordance with agreed scope of role and workplace procedures 
Support effective coordination of installation activity through engagement with construction work supervisor and other tradespeople 
Monitor quality and safety of work through ongoing communication with key site stakeholders and physical site inspections 
Monitor the work and performance of subcontracted plant operators and staff against agreed requirements 
Prepare site reports of supervisory inspections with any variation requests or requirements and communicate to the appropriate person 
Complete administrative processes with reference to relevant regulatory and organisational requirements 
Inspect and monitor site checklists, detailing specific items at appropriate stages 
Use industry and organisational quality manuals and procedures in managing the quality process with all quality requirements communicated to on-site personnel 
Check work against contractual quality standards and organise and check any required rectifications for completion 
Arrange and accurately document regulatory inspections of the completed installation 
Accurately complete final contract documentation in accordance with job requirements and communicate to relevant personnel 

Forms

Assessment Cover Sheet

MSFGG4016 - Plan and coordinate commercial glazing installations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFGG4016 - Plan and coordinate commercial glazing installations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: