MSFSL5004
Install heritage leadlight and stained glass

Assessment tool

Version 1.0
Issue Date: May 2024


This unit of competency covers installing heritage leadlight and stained glass panels following their conservation.

Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking glass and glazing work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify and plan installation requirements

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with

1.2

Location of the leadlight and stained glass panel to be installed is established, confirmed and clarified with appropriate personnel

1.3

Installation sequence is identified and a work plan is developed

1.4

Tools and equipment required for the installation are identified

1.5

Approval of installation plan is obtained as required by agreed procedures

2

Prepare for installation

2.1

Tools and equipment are positioned and checked prior to use to ensure they are appropriate for the installation, serviceable and in a safe condition

2.2

Inspection of the opening where the panel is to be installed is conducted

2.3

Leadlight and stained glass panel is inspected to ensure its integrity while being installed

2.4

Plans and other documents are positioned to allow for confirmation of the panel structure and placement

2.5

Photographs are taken of the panel for later reference

3

Install the panel

3.1

Panel is installed and placed in position

3.2

Supporting frames are removed from the panel

3.3

Panel structural supports are installed and checked

3.4

Structural damage is identified and noted

3.5

Photographs of process of installation are taken for later reference

4

Finalise and report on the installation

4.1

Installed panel is inspected and damage resulting from the installation is identified and rectified

4.2

Tools and equipment are removed cleaned and stored appropriately

4.3

Removal area is cleaned and rubbish disposed of, as appropriate

4.4

Installation report is prepared and provided, as required

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Identify and interpret heritage legislation as it applies to leadlight and stained glass panels

Identify historical leadlight and stained glass panel construction methods

Identify framing, structural and construction techniques relevant to leadlight and stained glass panels

Identify appropriate installation methodologies

Install at least two (2) heritage leadlight and stained glass panels in different locations

Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for the removal of heritage leadlight and stained glass panels

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to the full range of processes for leadlight and stained glass operations

Lead light and stained glass panels construction and repair terminology and techniques

The principles of the Australia International Council on Monuments and Sites (ICOMOS) Burra Charter

Organisational and site standards, requirements, policies and procedures for the installation of heritage leadlight and stained glass panels

Types of glass and other materials historically used in the leadlight and stained glass industry, their characteristics, properties, uses and limitations

Heritage requirements specific to leadlight and stained glass

Engineering aspects of supporting leadlight and stained glass panels during the installation process

Established communication channels and protocols

Relevant problem identification and resolution for heritage leadlight and stained glass

Storage systems and labelling

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to a panel, materials, equipment and specifications relevant to the installation of heritage leadlight and stained glass panels following conservation work.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Identify and plan installation requirements

1.1

Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with

1.2

Location of the leadlight and stained glass panel to be installed is established, confirmed and clarified with appropriate personnel

1.3

Installation sequence is identified and a work plan is developed

1.4

Tools and equipment required for the installation are identified

1.5

Approval of installation plan is obtained as required by agreed procedures

2

Prepare for installation

2.1

Tools and equipment are positioned and checked prior to use to ensure they are appropriate for the installation, serviceable and in a safe condition

2.2

Inspection of the opening where the panel is to be installed is conducted

2.3

Leadlight and stained glass panel is inspected to ensure its integrity while being installed

2.4

Plans and other documents are positioned to allow for confirmation of the panel structure and placement

2.5

Photographs are taken of the panel for later reference

3

Install the panel

3.1

Panel is installed and placed in position

3.2

Supporting frames are removed from the panel

3.3

Panel structural supports are installed and checked

3.4

Structural damage is identified and noted

3.5

Photographs of process of installation are taken for later reference

4

Finalise and report on the installation

4.1

Installed panel is inspected and damage resulting from the installation is identified and rectified

4.2

Tools and equipment are removed cleaned and stored appropriately

4.3

Removal area is cleaned and rubbish disposed of, as appropriate

4.4

Installation report is prepared and provided, as required

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes:

WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent

work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements

work requires individuals to demonstrate discretion and apply judgement and problem solving to complex issues

Appropriate personnel include:

clients

architects

engineers

construction supervisors

members of heritage committees

government agencies

other specialist artisans, such as stonemasons

Tools and equipment include:

work benches

ladders and scaffolding

cameras

magnifying glasses

lights

cranes

forklifts

general hand tools

Inspection includes:

measuring to determine if the panel is the correct size and ensuring that the supporting infrastructure required for the panel is in place

Plans and other documents include:

original architectural plans

original drawings, cartoons and cut lines of the panel

historical documents and photographs

contemporary photographs

charcoal rubbings

sketches

Installation includes:

the requirement to dismantle the panel prior to installation to stop further damage, and assembling the panel in place

Supporting frames include:

wooden or metal frames that support the leadlight and stained glass panels during its transportation and installation

Installation report includes:

detailing the extent of any damage to the surrounding building or fixture

any damage to the panel

any recommendations as to future requirements

Personal protective equipment includes:

that prescribed under legislation, regulation and enterprise policies and practices:

gauntlets

gloves

safety glasses

hard hats

safety footwear

aprons and overalls

Information and procedures include:

workplace procedures relating to the use of tools and equipment and personal protective equipment

work instructions, including job sheets, cutting lists, plans, drawings and designs

workplace procedures relating to reporting and communication

manufacturer specifications and operational procedures

Interpret work order and locate and apply relevant information

Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment

Identify materials used in the work process

Follow work instructions, operating procedures and inspection processes to:

minimise the risk of injury to self or others

prevent damage to goods, equipment and products

maintain required production output and product quality

Identify and interpret heritage legislation as it applies to leadlight and stained glass panels

Identify historical leadlight and stained glass panel construction methods

Identify framing, structural and construction techniques relevant to leadlight and stained glass panels

Identify appropriate installation methodologies

Install at least two (2) heritage leadlight and stained glass panels in different locations

Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for the removal of heritage leadlight and stained glass panels

Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements

Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures

Avoid backtracking, work flow interruptions or wastage

Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

State or territory WHS legislation, regulations, standards and codes of practice relevant to the full range of processes for leadlight and stained glass operations

Lead light and stained glass panels construction and repair terminology and techniques

The principles of the Australia International Council on Monuments and Sites (ICOMOS) Burra Charter

Organisational and site standards, requirements, policies and procedures for the installation of heritage leadlight and stained glass panels

Types of glass and other materials historically used in the leadlight and stained glass industry, their characteristics, properties, uses and limitations

Heritage requirements specific to leadlight and stained glass

Engineering aspects of supporting leadlight and stained glass panels during the installation process

Established communication channels and protocols

Relevant problem identification and resolution for heritage leadlight and stained glass

Storage systems and labelling

Procedures for the recording, reporting and maintenance of workplace records and information

Appropriate mathematical procedures for estimation and measurement

Assessors must:

hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors

have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification

be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.

Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts.

Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, projects and work samples.

Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.

Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines.

Access is required to a panel, materials, equipment and specifications relevant to the installation of heritage leadlight and stained glass panels following conservation work.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Applicable work health and safety (WHS), legislative and organisational requirements relevant to leadlight and stained glass operations are verified and complied with 
Location of the leadlight and stained glass panel to be installed is established, confirmed and clarified with appropriate personnel 
Installation sequence is identified and a work plan is developed 
Tools and equipment required for the installation are identified 
Approval of installation plan is obtained as required by agreed procedures 
Tools and equipment are positioned and checked prior to use to ensure they are appropriate for the installation, serviceable and in a safe condition 
Inspection of the opening where the panel is to be installed is conducted 
Leadlight and stained glass panel is inspected to ensure its integrity while being installed 
Plans and other documents are positioned to allow for confirmation of the panel structure and placement 
Photographs are taken of the panel for later reference 
Panel is installed and placed in position 
Supporting frames are removed from the panel 
Panel structural supports are installed and checked 
Structural damage is identified and noted 
Photographs of process of installation are taken for later reference 
Installed panel is inspected and damage resulting from the installation is identified and rectified 
Tools and equipment are removed cleaned and stored appropriately 
Removal area is cleaned and rubbish disposed of, as appropriate 
Installation report is prepared and provided, as required 

Forms

Assessment Cover Sheet

MSFSL5004 - Install heritage leadlight and stained glass
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSFSL5004 - Install heritage leadlight and stained glass

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: