You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice
Yes
No
Comments/feedback
Confirm the scope and purpose of sampling and monitoring data requirements
Read and interpret available site information, including site plan, bore locations, construction and history of sampling and monitoring to identify factors relevant to current work
Confirm the sampling methods, locations, numbers and types of samples, and duration and frequency of sampling from workplace or client’s sampling plan
Check that all sampling and testing procedures are in accordance with client or workplace requirements, standards and guidelines
Identify site and sampling hazards and review work, health and safety (WHS) procedures to determine control measures
Liaise with relevant personnel to arrange site access and obtain any clearances and/or permits
Read and interpret field sampling procedures and sample preparation methods required for specific laboratory analyses
Select purging and sampling equipment and sampling conditions to achieve representative samples and preserve sample integrity during collection, storage and transit
Obtain and prepare all reagents, solutions, standards and blanks for field use
Select field test equipment and instruments and check operation and calibration in accordance with methods, procedures and manufacturer instructions
Assemble all sampling equipment, field test equipment, materials, containers and safety equipment and stow for safe transport
Arrange suitable transport to, from and around site
Confirm location of well or bore and groundwater monitoring requirements using site sampling and monitoring plan
Examine the well or bore area to identify possible hazards and apply controls
Check proposed well/bore construction method to identify contamination risks and liaise with supervisor on action to be taken
Check that casing and any other materials used in the bore are free of contaminants
Check that tools and sampling equipment are cleaned thoroughly before construction of well or bore commences
Check that protective casings and screens are kept in their protective coverings prior to installation
Provide advice and/or guidance to other personnel on action to be taken to prevent and correct contamination issues
Monitor process to accurately log samples and prevent their contamination
Locate sampling locations and services at the site and identify possible hazards and control measures
Conduct sufficient measurements to accurately determine water level and bore depth
Record bore and environmental conditions and any atypical observations made during sampling that may impact on sample representativeness or integrity
Conduct purging in accordance with defined procedure or method, collect the waste and decontaminate the equipment used
Collect required representative samples and ensure all controls, blanks and replicate samples are correctly integrated into the sampling process
Record information and label samples in accordance with chain of custody and traceability requirements
Filter and prepare samples to preserve their integrity for subsequent analysis
Secure and transport samples back to base in accordance with workplace procedures and guidelines
Assemble monitoring instruments, equipment and reagents required for field tests and conduct pre-use checks in accordance with manufacturer instructions
Retrieve samples for designated field tests or locate established locations for in-situ testing
Set up, calibrate and operate equipment and instruments in accordance with test methods, procedures and manufacturer instructions
Take sufficient measurements of groundwater field parameters to obtain reliable data and in accordance with specified methods and procedures
Record all field observations and data and transfer accurately to workplace information database
Read and interpret test data noting atypical observations
Check that calculated values are consistent with expectations and recalculate to correct any errors
Estimate and document uncertainty of measurements in accordance with workplace procedures
Record and report processed results in accordance with workplace procedures
Interpret trends in data and results and report out-of-specification or atypical results promptly to relevant personnel
Determine any obvious procedure or equipment problems which led to atypical data or results
Compare results with established groundwater quality standards and/or statutory environmental quality concentration limits
Finalise reporting of results in accordance with workplace requirements
Use defined safe work practices and personal protective equipment (PPE) to ensure personal safety and that of others
Rehabilitate sampling site to render it safe and to minimise environmental impact
Clean and decontaminate equipment, containers, work area and vehicles according to workplace procedures
Check serviceability of equipment before storage
Minimise the generation of wastes and environment impacts
Liaise with relevant personnel for the safe collection of hazardous wastes for disposal
Forms
Assessment Cover Sheet
MSS025034 - Collect and evaluate groundwater data
Assessment task 1: [title]
Student name:
Student ID:
I declare that the assessment tasks submitted for this unit are my own work.
Student signature:
Result: Competent Not yet competent
Feedback to student
Assessor name:
Signature:
Date:
Assessment Record Sheet
MSS025034 - Collect and evaluate groundwater data
Student name:
Student ID:
Assessment task 1: [title] Result: Competent Not yet competent
(add lines for each task)
Feedback to student:
Overall assessment result: Competent Not yet competent