Assessor Resource

MSS404090
Support proactive maintenance

Assessment tool

Version 1.0
Issue Date: May 2024


You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Demonstrate to team how to observe process and equipment continuously and critically using senses to identify potential and actual problems 
Asist team to understand data indicators relevant to process and equipment 
Set and oversee schedules for data monitoring and recording 
Assist team to recognise symptoms of operations outside desired range of conditions and performance 
Analyse cause of equipment non-standard performance within scope of role 
Support team members to take timely action to solve and refer problems in accordance with procedures 
Obtain maintenance strategy and discuss with relevant people 
Identify aspects of maintenance strategy which require specific input from team 
Discuss maintenance strategy with team members 
Ensure team members have resources and training to be able to make required contributions 
Read and review team procedures and practices for compatibility with maintenance strategy 
Identify areas where production procedures and practices should be changed to comply with maintenance strategy 
Identify areas where maintenance strategy should change to comply with production procedures and practices 
Identify activities or areas where changes might increase equipment reliability 
Take action to have required changes made 
Monitor team members’ contribution to proactive maintenance and identify need for guidance and/or other support 
Provide guidance and/or arrange for skills or other development for team members 
Facilitate ongoing examination by team of process reliability and overall equipment effectiveness (OEE) 
Arrange for follow through and implementation of team originated improvements 

Forms

Assessment Cover Sheet

MSS404090 - Support proactive maintenance
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

MSS404090 - Support proactive maintenance

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: