List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENTS | PERFORMANCE CRITERIA |
Elements describe the essential outcomes | Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section. |
1. Determine inspection reporting requirements | 1.1 Determine the inspection reporting standard and special inspection and reporting requirements of the client or asset owner from specifications and instructions. 1.2 Obtain plans and maps of assets to be inspected and identify relevant asset data. 1.3 Seek clarification of inspection reporting requirements from the client/asset owner for unusual or non-routine inspections. 1.4 Verify the competence of operators undertaking the inspection. |
2. Review video images, data and reports from inspections | 2.1 Check video records of inspections. 2.2 Compile documentation from inspection and check for completeness and accuracy. 2.3 Recognise unsatisfactory video images and other non-compliant data and submit non-compliance reports to the operator. 2.4 Label and reference inspection information. |
3. Identify and code defects and other features from video images of conduit inspection | 3.1 Identify and code structural defects, service conditions and other features of the conduit. 3.2 Record asset and inspection data using appropriate software. 3.3 Investigate and report unrecognisable defects, service conditions or other features. 3.4 Identify a conduit at risk of imminent failure and communicate details to the system operator/asset owner. 3.5 Confirm defects or malfunctioning of maintenance holes, pits or other access structures with the operator and report. |
4. Prepare conduit inspection reports for client | 4.1 Compile inspection reports and present to the client. 4.2 Follow inspection video and data security procedures. |
Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.
using data capture software
accessing and interpreting conduit details from asset information systems, construction drawings, plans, maps, house service diagrams
identifying inspection reporting requirements in specifications
supervising or managing the inspection and reporting of the condition and features in sewer and stormwater conduits using specialised CCTV equipment
identifying and correctly coding all critical defects and/or features of conduits observable in inspection video records
reading and interpreting a wide range of numerical data from construction drawings, plans, maps and service diagrams
recognising non-compliant video images and data from conduit inspections
interpreting asset information on maps, plans and drawings of the conduit provided by the asset owner/operator/client
Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.
industry inspection reporting code
data capture, recording and reporting software
asset information systems
operational plans, maps
design plans for construction
features of conduits used in Australia or operating area for gravity sewer and stormwater construction over the last 100 years
construction and operation of sewerage and stormwater systems
Competency should be assessed in an actual workplace or in a simulated environment, with access to equipment and infrastructure appropriate to the outcome. Competency should be demonstrated over time to ensure the candidate is assessed across a variety of situations.
Assessors must satisfy the NVR/AQTF mandatory competency requirements for assessors.