Assessor Resource

RIIRAI509A
Implement mine fixed plant and infrastructure systems

Assessment tool

Version 1.0
Issue Date: May 2024


This unit is appropriate for those working in a management role or as a technical specialist, managing or advising on mine fixed plant and infrastructure systems within:

Coal mining

This unit covers the implementing mine fixed plant and infrastructure systems in the coal mining industry. It includes planning and preparing for the implementation of the systems; implementing installation and commissioning procedures; implementing systems for the operation and maintenance; and implementing systems for audit and review of fixed plant and infrastructure.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Co-Requisites

Not applicable.


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions to implement mine fixed plant and infrastructure systems

implementation of procedures and techniques for the safe, effective and efficient implementation of mine fixed plant and infrastructure systems

the identification of the relevant information and scope of the work required to meet the required outcomes

the identification of viable options and the selection of options that best meet the required outcomes

working with others to implement mine fixed plant and infrastructure systems

consistent successful implementing of mine fixed plant and infrastructure systems

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Assessment of this competency requires typical resources normally used in a civil works environment. Selection and use of resources for particular worksites may differ due to site circumstances.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes

identification of the relevant information and scope of the work required to meet the required outcomes

identification of viable options and the selection of options that best meet the required outcomes

consistently achieving the required outcomes

first hand testimonial and documentary evidence of the candidate's:

working with others to implement mine fixed plant and infrastructure systems

provision of clear and timely required support and advice on the applying the mine fixed plant and infrastructure systems

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to implement mine fixed plant and infrastructure systems:

apply legislative, organisation and site requirements and procedures

access, interpret and apply:

technical information

site/legislative requirements

records and reports

briefings and handover details

apply hazard identification and risk management processes

apply work planning and coordination procedures

apply training needs analysis

interpret and apply manufacturers' instructions

apply maintenance survey procedures

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to implement mine fixed plant and infrastructure systems:

legislative, statutory, Australian standards and site-specific requirements for plant and infrastructure, including:

mine plan

electrical rules

electrical/mechanical equipment

communications

emergency procedures

risk management

recording and reporting

mines rescue

OHS

Manufacturer's instructions

standard work procedures

training

fire fighting

handling and storage of dangerous goods

local government requirement

local power authority

open cut mine operations systems and procedures

stores systems

protection systems

reticulation systems

specifications for fixed plant and infrastructure

audit processes

mine design principles and procedures relating to fixed plant and infrastructure

power sources, including electrical, hydraulic, pneumatic and diesel

computer based systems

training programs

fire fighting systems and precaution rules

safety design features for maintenance of fixed plant and infrastructure

maintenance surveys

training systems

emergency response and evacuation planning processes and techniques

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation

may include:

legislative, organisation and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Fixed plant may include:

crushers

screens

conveyors

feeders

coal or waste handling systems

Infrastructure may include:

roads and railways

dams

fencing

stockpile/product bays

salvage area

reticulation systems

car park

communications

power supply

tailings

buildings, including:

ablutions

amenities

change room

chemical stores

control rooms

dangerous goods store

explosives magazines

First Aid

fuel storage

laboratory

mines rescue station

offices

oil store

power station

supply stores

tyre stores

weighbridge

workshops

Hazard is defined as:

a source of potential harm or a situation with a potential to cause loss

Risk is defined as:

the chance of something happening that will have an impact upon objectives. It is measured in terms of consequences and likelihood

Emergency response systems may include:

designated escape ways

evacuation procedures

alarm systems

guidance systems

emergency communication systems

self-aided escape apparatus

rescue capability

Audit is defined as:

a systematic examination against defined criteria to determine whether activities and related results conform to planned arrangement, and whether these arrangements are implemented effectively and are suitable to achieve the organisation policy and objectives

Reporting and recording systems include site requirements and may include:

phones

radios

computer systems

verbal and written

Standard operating procedures (SOP) are also known as:

safe working procedures, safe operating procedures and standard working procedures

Safety systems may include:

legislation (legal requirements)

location

site layout

purpose

environmental control (spontaneous combustion, gas, noise, water, heat, dust)

protection systems (guarding, fire protection and suppression, electricity, lightning arresters, ventilation in explosives magazines and earthing)

Specifications may include:

performance requirements

costs

dimensions

capacity

OHS requirements

training requirements

key selection criteria

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to implementing mine fixed plant and infrastructure systems 
Identify the requirements of fixed plant and infrastructure in accordance with mine design and system of mining 
Identify site requirements for the implementation of fixed plant and infrastructure 
Identify and implement safety systems 
Identify and interpret the specification for the required fixed plant 
Identify, clarify and communicate roles and responsibilities 
Implement the program to satisfy identified fixed plant and infrastructure training requirements 
Assess and interpret safe operating procedures 
Identify hazards associated with the installation of fixed plant and infrastructure and evaluate and respond to risks in accordance with established procedures 
Integrate new and existing fixed plant and infrastructure and processes to achieve optimum performance 
Implement safe operating procedures 
Implement fixed plant and infrastructure installation and commissioning procedures 
Install fixed plant and infrastructure at the worksite in accordance with manufacturer instructions and site procedures 
Commission fixed plant and infrastructure systems in accordance with manufacturer's instructions and site procedures 
Modify systems to satisfy required changes arising from the commissioning process 
Implement emergency response and evacuation plans and procedures in accordance with site requirements 
Implement operational procedures for fixed plant and infrastructure according to site requirements 
Implement maintenance procedures for fixed plant and infrastructure according to manufacturer and site requirements 
Implement and apply procedures for reviewing and modifying work processes 
Audit fixed plant and infrastructure standards for compliance with statutory and site requirements 
Audit fixed plant and infrastructure maintenance standards for currency and compliance with statutory and site requirements 
Audit fixed plant and infrastructure for compliance with site standards 
Audit reporting and recording systems for fixed plant and equipment and infrastructure for compliance with statutory and site requirements 
Audit the fixed plant and infrastructure training program for currency, relevance and compliance with site requirements 
Audit emergency response and evacuation plans and procedures for compliance with site requirements 

Forms

Assessment Cover Sheet

RIIRAI509A - Implement mine fixed plant and infrastructure systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIIRAI509A - Implement mine fixed plant and infrastructure systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: