Assessor Resource

RIISRM601A
Establish and maintain the stockpile management system

Assessment tool

Version 1.0
Issue Date: May 2024


This unit is appropriate for those working in management or technical specialist role, within:

Coal mining

Extractive industries

Metalliferous mining

This unit covers the establishing and maintaining of stockpile management systems in the coal and metalliferous mining and extractive industries. It includes: identifying and researching the requirements; facilitating the designing of systems, selection of equipment, installation and commissioning procedures, systems for the operation and maintenance; and establishing systems for audit and review of the systems.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Co-Requisites

Not applicable.


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

knowledge of the requirements, procedures and instructions for the establishing and maintaining of stockpile management systems

implementation of procedures and techniques for the safe, effective and efficient establishing and maintaining of stockpile management systems

the identification of the relevant information and scope of the work required to meet the required outcomes

the identification of viable options and the selection of options that best meet the required outcomes

working with others to establish and maintain stockpile management systems

consistent and timely establishing and maintaining of the stockpile management systems

Context of and specific resources for assessment

This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.

The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.

Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.

Aboriginal people and other people from a non English speaking background may have second language issues.

Assessment of this competency requires typical resources normally used in a civil works environment. Selection and use of resources for particular worksites may differ due to site circumstances.

Where applicable, physical resources should include equipment modified for people with disabilities.

Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

written and/or oral assessment of the candidate's required knowledge

observed, documented and/or first hand testimonial evidence of the candidate's:

implementation of appropriate procedures and techniques for the safe, effective and efficient achievement of the required outcomes

identification of the relevant information and scope of the work required

identification of viable options and the selection of options that best meet the required outcomes

consistently achieving the required outcomes

first hand testimonial and documentary evidence of the candidate's:

working with others to establish and maintain stockpile management systems

consistent and timely gaining of approval of stockpile management systems

provision of clear, timely required support and advice on the implementation of stockpile management systems

Guidance information for assessment

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to establish and maintain the stockpile management system:

apply legislative, organisation and site requirements and procedures

apply procedures for designing and implementing stockpile configurations

apply procedures for monitoring and maintaining stockpile operations

apply techniques for managing people and processes

apply requirements for preparing capital equipment proposals

apply procedures for analysing and reviewing stockpile operations and costs

apply procedures for managing projects and tasks

apply procedures for coordinating resources, human, financial and physical

apply procedures for delivering and maintaining services to required specifications

apply worksite traffic management requirements and procedures

apply procedures for managing equipment and maintenance systems

apply techniques for evaluating new and used equipment

apply operating cost control requirements and procedures

interpret and comply with statutory requirements

apply procedures for planning operations

apply requirements for preparing tender specifications

apply techniques for negotiating and finalising contracts

access and use technologies

apply requirements for preparing and presenting management reports

apply techniques for negotiating with internal/external customers, community and statutory/legal authorities

apply conflict resolution techniques

Required knowledge

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to establish and maintain the stockpile management system:

risk management, principle, strategies and applications

statutory control requirement

safety and health requirements

environmental management requirements

quality system requirements

organisational objectives

worksite plans and operations

worksite products

characteristics, uses and limitations of stockpile equipment

stockpile configuration

stockpile design

training systems

emergency response and evacuation planning processes and techniques

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation

may include:

legislative, organisation and site requirements and procedures

manufacturer's guidelines and specifications

Australian standards

code of practice

Employment and workplace relations legislation

Equal Employment Opportunity and Disability Discrimination legislation

Hazard is:

a source or a situation with a potential for harm in terms of human injury or ill-health, damage to property, damage to the environment or a combination of these

Risk is:

the combination of the frequency, or probability of occurrence and consequence of a specified hazardous event

Stockpile system and configurations may include:

access to and from stockpile

amount to be stored

edge control

material, size, shape

method of loading/unloading

method of storing

reconciliation of stocks transfers

delivery to stockpile

withdrawal methods

blending requirements

operating method

level or volume monitoring

spontaneous combustion

automation

segregation

site safety requirements

reporting

safety of area

segregation

site modification

sprinkler systems to keep stockpiles damp to control dust

stockpile floor

stockpile identification

Audit is:

a systematic examination against defined criteria to determine whether activities and related results conform to planned arrangements and whether these arrangements are implemented effectively and are suitable to achieve the organisation's policy and objectives

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Access, interpret and apply compliance documentation relevant to stockpile management systems 
Analyse and document organisation goals, objectives and strategies in relation to the establishment of the management system 
Investigate and analyse worksite environments to develop options, strategies and anticipated outcomes 
Develop and implement strategies that translate the objective into the planning process 
Ensure the requirements for and the purpose of stockpile management systems are identified in accordance with legislative requirements 
Ensure specifications for stockpile systems are developed from a comprehensive analysis of site requirements 
Ensure system options are identified from an analysis of all relevant technical, operational and financial information 
Ensure the economics and efficiency of the stockpiling system and configuration to be used is evaluated 
Ensure the requirements for and the purpose of stockpile equipment is identified against systems requirements 
Ensure a detailed scoping of the work requirement is conducted, and that key selection criterion, including hazard identification and risk analysis, is developed 
Ensure a specification for the required stockpile equipment is developed 
Ensure the preferred equipment solutions are selected on the basis of performance against specification requirements 
Ensure a procedure to identify hazards and analyse and evaluate risks associated with the installation of stockpiling systems and equipment is developed and implemented 
Ensure the integration of new and existing systems and processes is planned and prepared to achieve optimum performance 
Ensure safe operating procedures and rules are developed from a detailed analysis of site requirements 
Ensure procedures for installing and commissioning stockpile systems and equipment are developed and implemented 
Ensure a program to satisfy identified stockpiling training requirements is implemented 
Ensure emergency response and evacuation systems, plans and procedures are implemented 
Ensure operational procedures for stockpile systems and equipment are developed from legislative and organisation's requirements and are incorporated into site documentation 
Ensure maintenance procedures for stockpile systems and equipment are developed from legislative and organisation's requirements and are incorporated into site documentation 
Ensure procedures for reviewing and modifying work processes are developed and implemented 
Establish procedures to evaluate and confirm system/equipment compliance with statutory and site requirements 
Ensure future stockpile systems and equipment requirements identified and assessed and incorporate into planning processes 
Ensure procedures to confirm the currency and compliance of stockpile maintenance and safety standards are developed and implemented 
Ensure the system for recording and reporting of stockpile and equipment information is developed and implemented 
Audit the stockpile training program for currency and relevance 
Ensure procedures for incorporating feedback into the audit/review system are developed and implemented 
Audit emergency response and evacuation systems, plans and procedures for compliance with site requirements 
Ensure procedures for response to instances of non- compliance or other discrepancies/deficiencies revealed by audit are developed and implemented 

Forms

Assessment Cover Sheet

RIISRM601A - Establish and maintain the stockpile management system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

RIISRM601A - Establish and maintain the stockpile management system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: