The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
Relevant compliance documentation may include: | legislative, organisation and site requirements and procedures manufacturer's guidelines and specifications Australian standards code of practice Employment and workplace relations legislation Equal Employment Opportunity and Disability Discrimination legislation |
Work instructions may include: | plans, specifications, quality requirements and operational details quality requirements may include: dimensions, tolerances, standards of work and material standards as detailed in the project drawings, specifications and project documentation to meet client satisfaction |
Safety requirements may come from the site safety plan and organisational policies and procedures and may include: | protective clothing and equipment, use of tools and equipment, workplace environment and safety, handling of materials, use of fire fighting equipment, use of First Aid equipment, hazard control and hazardous materials and substances personal protective equipment, including that prescribed under legislation, regulation and workplace policies and practices safe operating procedures, including: recognising and preventing hazards associated with overhead services, other machines, personnel, restricted access barriers, traffic control, working in proximity to others, worksite visitors and the public hazards and risks, including: uneven/unstable terrain, trees, fires, underground services, bridges, buildings, excavations, traffic, embankments, cuttings, structures and hazardous materials emergency procedures related to emergency shutdown and stopping, organisational First Aid requirements and evacuation |
Tools and equipment are to include: | hand tools, pumps and hand operated excavation equipment and may include lighting systems, generators, boats, pipe reels and mechanical excavation plant |
Environmental Requirements are to include: | organisational/project environmental management plan, waste management, water quality protection, noise, vibration, dust and clean-up management |
Materials may include: | natural materials may include but are not limited to clays, silts, stone, gravel, mud, rock, sand, topsoil and bituminous mixes materials may include piping, conduit and consumables associated with dewatering systems |