Work is performed under minimal supervision, generally in a team environment. It involves the application of routine operational principles and procedures to the implementation of structures maintenance and installation of minor structures as part of workplace activities across a variety of operational contexts within the Australian rail system.

This unit involves the skills and knowledge required to implement structures maintenance and installation of minor structures in accordance with approved standards, safeworking and regulatory requirements, and workplace procedures. It includes planning work, implementing maintenance activities, dealing with maintenance and construction problems, and completing required documentation.

Licensing or certification requirements are not applicable to this unit. Persons achieving competence in this unit will need to fulfil legislated rail safety requirements, including acts and regulations from each applicable state and territory, together with any nationally approved compliance codes and/or guidelines.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not Applicable


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:

the underpinning knowledge and skills

relevant legislation and workplace procedures

other relevant aspects of the range statement

Assessment must include exercises that demonstrate competent performance of the following in a range of situations:

planning work, including selecting appropriate methods, sequencing work and arranging resources

implementing, monitoring and evaluating maintenance activities

dealing appropriately with a number of maintenance and construction problems

completing documentation according to workplace requirements

Assessment must include exercises that demonstrate competent performance in implementing five of the listed activities below. These must be a combination of the 2 designated activities, plus 1 of the specified activities, plus 2 of the remaining activities:

designated activities (2):

installing transoms

installing minor structures

specified activities (any 1):

repairing concrete/masonry structures

repairing timber structures

repairing steel structures

remaining activities (any 2):

maintaining bridge bearings

carrying out routine maintenance of structures

installing temporary track support

mixing and placing chemical repair products

Context of and specific resources for assessment

Performance is demonstrated consistently over a period of time and in a suitable range of contexts

Resources for assessment include:

a range of relevant exercises, case studies and/or other simulated practical and knowledge assessment, and/or

access to an appropriate range of relevant operational situations in the workplace

In both real and simulated environments, access is required to:

relevant and appropriate materials and equipment, and

applicable documentation, including workplace procedures, regulations, codes of practice and operation manuals

Method of assessment

As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests

Practical assessment must occur:

through activities in an appropriately simulated environment, and/or

in an appropriate range of situations in the workplace


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

REQUIRED KNOWLEDGE AND SKILLS

This describes the essential knowledge and skills and their level required for this unit.

Required knowledge:

Relevant safety, OH&S and environmental procedures and regulations

Fundamentals of all rail infrastructure

Structure infrastructure and the interaction of all interfaces

Structure defects

Range of structure maintenance and construction techniques and work processes

Range of competencies required to carry out structure maintenance and construction

Relevant engineering standards, specifications and codes of practice

Problems that may occur during structure maintenance and minor construction, and action that can be taken to report or resolve them

Hazards that may exist when undertaking structure maintenance and minor construction, and ways of controlling the risks involved

Relevant communication systems and procedures

Authorisation/approval processes and procedures

Documentation and record-keeping requirements

Required skills:

Communicate effectively with others when maintaining structures and installing minor structures

Read and interpret instructions, procedures, information, technical data, standards and drawings relating to implementing structures maintenance and the installation of minor structures

Interpret and follow operational instructions and prioritise work

Select appropriate equipment

Select appropriate work techniques

Monitor, sequence and implement work activities in terms of planned schedule and appropriateness, in conformance with standards and procedures

Complete documentation

Operate electronic communication equipment to required protocols

Work collaboratively with others when maintaining structures and installing minor structures

Diagnose causes and effects of system faults and failures resulting from the work activities

Assess impact of work on structure integrity and on track system integrity

Report and rectify within limits of own role problems, faults and malfunctions that may occur when maintaining structures and installing minor structures, in accordance with regulatory requirements and workplace procedures

Implement contingency plans for unexpected events when maintaining structures and installing minor structures

Apply precautions and required action to minimise, control or eliminate potential hazards during work activities

Modify activities depending on differing operational contingencies, risk situations and environments

Work systematically with required attention to detail without injury to self or others, or damage to goods or equipment

Operate and adapt to differences in equipment in accordance with standard operating procedures

Select and use required personal protective equipment (PPE)

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.

Scope of work may include:

identifying deficiencies

identifying preparatory or ancillary work required

Work may involve:

exposure to chemicals, and dangerous or hazardous substances

movements of equipment, goods and vehicles

Structures maintenance and construction activities may include:

maintaining structures

repairing structures

removing structure components

installing structure components

installing transoms

Structures may include:

bridges

pipes and culverts

tunnels

platforms

retaining walls

overhead wiring structures

level crossings

buffer stops

Work methods may vary according to:

location

type of structure

structure material type

climatic conditions

track availability

Extent of activity may vary according to:

complexity of task

track availability

scope of work including:

type of structure being worked on

type of maintenance and construction activities being undertaken

Track availability may include working:

during breaks in traffic

on limited track possession

during extended track possession

on non-operational track or track under construction

Equipment may include:

mechanical handling/lifting equipment

hand tools

small power tools

oxy cutting equipment

scaffolding

ladders

elevated work platform (EWP)

cranes

Liaison may include:

internal or external personnel from other work areas (e.g. train controllers, electricians)

Communications systems may include:

two-way radios

telephones/mobile phones

agreed audible or hand signal

Depending on work context, safety and personal protective equipment may include:

high visibility clothing

hearing protection

gloves

sunscreen

sunglasses

safety glasses

dust mask

insect repellent

safety headwear

safety footwear

portable radios/mobile phones

hand lamps

flags

safety devices

Depending on the type of organisation concerned and the local terminology used, workplace procedures may include:

company procedures

enterprise procedures

organisational procedures

established procedures

Information and documents may include:

operational instructions, policies and workplace procedures

local authority regulations and procedures

information provided by other workplace personnel

track inspections and reports

work orders

technical instructions

manufacturer or workplace equipment instructions and operation manuals

emergency procedure manuals

two-way radio or mobile telephone operation procedures

quality assurance (QA) plans, data and document control

conditions of service, legislation and industrial agreements, including workplace agreements and awards

Applicable procedures and codes may include:

legislated rail safety requirements, including acts and regulations from each applicable state and territory, together with any nationally approved compliance codes and/or guidelines

relevant Australian standards (AS) and related requirements, including AS 4292

relevant state and territory legislation relating to:

environmental protection

OH&S

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Scope of work is confirmed 
Operational constraints are identified 
Information requirements are identified and accessed 
Method of work is selected and general operating sequence is determined 
Resources required for the work are arranged as required 
Competent personnel are allocated tasks in accordance with the work sequence 
Tasks are assessed as being in accordance with the predetermined sequence and appropriate for the work 
Work procedures are monitored and evaluated as being appropriate and in accordance with standards and procedures 
Human and other resources are assessed as being adequate for the work 
Causes and effects of system faults and failures in the worksite are diagnosed 
Impact of work on structure integrity is assessed 
Impact of work on track system integrity is assessed 
Appropriate action is taken to ensure structure and track system integrity 
Scope of work is modified to include related tasks and/or interfaces 
Related faults and/or failures beyond the authorised scope of work are reported 
Documentation on work undertaken is completed in accordance with workplace requirements 

Forms

Assessment Cover Sheet

TLIS3029B - Implement structures maintenance and installation of minor structures
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIS3029B - Implement structures maintenance and installation of minor structures

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: