Assessor Resource
UEGNSG138A
Install and commission stationary gas fuelled turbine engines
Assessment tool
Version 1.0
Issue Date: May 2024
2)
2.1) General Application
This competency standard unit is suitable for employment-based programs under an approved contract of training at the AQF level of the qualification in which the unit is first packaged or higher.
The unit may be selected as an elective (see qualification packaging rules) provided that all prerequisite units are undertaken or addressed through recognition processes.
This unit may be included in a skill set.
2.2) Importation
RTOs wishing to import this unit into any qualification under the flexibility provisions of NQC/NSSC Training Package Policy should ensure all pre-requisite units are also imported into the relevant Training Package and qualification.
1) Scope
1.1) Descriptor
This unit covers the installation and commissioning of stationary gas fuelled turbine engines, up to a capacity of 5GJ/hr (1300kw), for approval where required.
It encompasses working safely and to installation standards matching the plant/equipment, location, components and fuel train pipe-work to given specifications. Commissioning the plant and equipment including: pre commissioning tests, start up, adjusting components and controls to safe and efficient operation. Completing all necessary installation and commissioning documentation.
Note: 500kw equates to a gas input of approximately 6Gj/hr.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)