This unit involves the skills and knowledge required to diagnose and repair faults in power generation plant inverter systems, including associated accessories, components and wiring systems.

The diagnosis and repair of inverter system faults requires the inspection, repair and verification to ensure that it is working efficiently and meeting operational requirements.

Competency in this unit requires the ability to plan work, verify fault, find fault, determine cause of fault, repair fault and complete all work tasks. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site.

Power generation maintenance personnel are typically trained and authorised to receive permits to work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Note: Workplace practice

The application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Normal performance and function of inverter system equipment is ascertained by consulting appropriate personnel and reference sources, in accordance with workplace procedures 
Fault indicators, technical information and diagnostic techniques are used to verify reported faults, in accordance with workplace procedures 
Faults are reproduced and monitored, if possible, in accordance with workplace procedures 
Isolations are confirmed, where appropriate, in accordance with workplace procedures 
Equipment components, wires and terminations are inspected for faults, in accordance with workplace procedures 
Diagnostic techniques are selected and used, in accordance with workplace procedures 
Components are disconnected to enable accurate test measurements of suspected faulty components, without concern of back feed readings, in accordance with workplace procedures 
Test and measurement instruments are used, in accordance with workplace procedures and manufacturers' instructions 
Isolations are confirmed, where appropriate, in accordance with workplace procedures 
Faulty, worn or damaged components are replaced or repaired, in accordance with workplace procedures 
Parts and components are selected and used, in accordance with manufacturers' specifications and workplace procedures 
Inverter system components are disconnected for testing and are reconnected having been proven free of faults, and all terminations are then checked to ensure they are electrically and mechanically sound, in accordance with workplace procedures 
Faults are repaired, in accordance with workplace procedures 
Final inspection is performed, in accordance with workplace procedures 
Work is completed and appropriate personnel are notified, in accordance with workplace procedures 
Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures 
Tools and equipment are maintained and stored, in accordance with workplace procedures 
Work completion details are finalised, in accordance with workplace procedures 
Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures 
 
 
 
 
 
 
Normal performance and function of inverter system equipment is ascertained by consulting appropriate personnel and reference sources, in accordance with workplace procedures 
 
Isolations are confirmed, where appropriate, in accordance with workplace procedures 
 
 
 
 
Appropriate personnel are consulted to obtain details relating to faulty system, in accordance with workplace procedures 
 
Isolations are confirmed, where appropriate, in accordance with workplace procedures 
 
 
 
 
Work is completed and appropriate personnel are notified, in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEPMNT440 - Diagnose and repair faults in power plant inverter systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT440 - Diagnose and repair faults in power plant inverter systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: