This unit involves the skills and knowledge required to diagnose and repair faults in large scale wind turbine generator systems.

Diagnosing and repairing faults is the process of inspecting wind turbine generator systems to identify problems and ensure repairs take place. The aim is to enhance the overall delivery of large scale wind turbine generator systems.

Competency in this unit requires the ability to gather data, interpret data to establish a theory about fault, repair faults and record faults. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site.

Power generation maintenance personnel are typically trained and authorised to receive permits to work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Note: Workplace practice

The application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Wind turbine generator system's data logging information and error codes are accessed, in accordance with workplace procedures 
Wind turbine generator system's sensory data on fault is gathered 
Hard copy or online documentation is accessed to support fault finding process, in accordance with workplace procedures 
Fault indicators and error codes are examined and interpreted, in accordance with workplace procedures 
Circuit diagrams, manufacturers' specifications, schematics and/or consultation with technical advisors are used to determine circuit and system characteristics and function 
Risk analysis is undertaken, in accordance with workplace procedures, and is communicated to the work team 
Safety precautions including circuit isolations, physical barriers and other protective devices or systems are used, where appropriate 
Tests are conducted to ensure fault has been correctly repaired or isolated, in accordance with workplace procedures 
Wind turbine generator system faulty components that have been removed from service are examined and cause of problem is identified 
Loose connections or wiring in the wind turbine generator system are repaired, in accordance with workplace procedures 
Parts or components are removed and replaced with tested and operational parts 
Wind turbine generator system is tested, in accordance with workplace procedures, to ensure correct operation 
Fault finding process is escalated to repairing a complex fault using a technical adviser, if required 
Wind turbine generator system's faulty components and parts are correctly tagged, identified and stored, in accordance with workplace procedures 
Wind turbine generator system's faults are recorded, in accordance with workplace procedures 
Wind turbine generator system's data logging information and error codes are accessed, in accordance with workplace procedures 
 
 
 
 
Wind turbine generator system performance parameters are identified and applied to interpretation of fault data 
 
Risk analysis is undertaken, in accordance with workplace procedures, and is communicated to the work team 
 
 
 
 
 
 
Wind turbine generator system's faulty components and parts are correctly tagged, identified and stored, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPMNT445 - Diagnose and repair faults in large scale wind turbine generators
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT445 - Diagnose and repair faults in large scale wind turbine generators

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: