Assessor Resource

UEPMNT447
Diagnose and repair faults in wind turbine generator electrical systems

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to diagnose and repair faults in large scale wind turbine generator electrical systems.

Diagnosis and repair of faults is the process of optimising large scale wind turbine generator electrical system outcomes through regular inspection and verification of operational efficiency.

Competency in this unit requires the ability to gather data, interpret data to establish hypothesis about wind turbine generator electrical system fault, repair wind turbine generator electrical system faultand record wind turbine generator electrical system fault. Individuals will, in general, work under supervision in an electrical, electronic and/or mechanical equipment repair workshop or on site.

Power generation maintenance personnel are typically trained and authorised to receive permits to work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Note: Workplace practice

The application of the skills and knowledge described in this unit of competency may require a licence or training permit to practice in the workplace, where work is carried out on gas and electrical installations. Additional and/or other conditions may apply under state and territory legislative and regulatory licensing requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Data logging information and error codes are accessed, in accordance with workplace procedures 
Sensory data on fault is gathered, in accordance with workplace procedures 
Documentation is accessed, in accordance with workplace procedures, to support fault finding process 
Built in fault indicators and error codes are, where appropriate, examined and interpreted 
Reference to circuit diagrams, manufacturers' specifications, schematics or consultation with technical adviser is used to determine electrical circuit or system functions and characteristics 
 
 
 
 
Knowledge of wind turbine generator electrical systems and performance parameters is applied to interpretation of fault data 
 
 
Risk analysis is undertaken and is communicated to work team and appropriate personnel, in accordance with workplace procedures 
 
 
 
 
 
 
 
Wind turbine generator electrical system faulty components and parts are tagged, identified and stored, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPMNT447 - Diagnose and repair faults in wind turbine generator electrical systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPMNT447 - Diagnose and repair faults in wind turbine generator electrical systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: