This unit involves the skills and knowledge required to operate and inspect all air conditioning plant.

Air conditioning in power generation facilities refers to systems that cool air and remove humidity from areas filled with heat producing plant and equipment. A complete system of heating, ventilation, and air conditioning is referred to as Heating, Ventilation and Air Conditioning (HVAC).

Competency in this unit requires the ability to plan and prepare work; operate, test, analyse and report on air conditioning plant and complete all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator.

Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Note: Workplace practice

The application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Safety issues are identified, in accordance with Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, environmental legislation, industry standards and workplace procedures 
Work requirements are identified from relevant personnel and documentation, in accordance with workplace procedures 
Documentation to determine air conditioning plant status is assessed and evaluated, in accordance with workplace procedures 
Inspection for service is carried out, in accordance with workplace procedures and site operational requirements 
Air conditioning plant operational prerequisites are established, in accordance with manufacturers' recommendations and workplace procedures 
Sequence for recommissioning of air conditioning plant is determined, in accordance with workplace procedures 
Tests are performed on air conditioning plant, in accordance with workplace procedures 
Air conditioning plant is observed, in accordance with workplace procedures, for correct operational response 
Corrective action is taken, in accordance with workplace procedures 
Air conditioning plant is returned to required operational status upon completion of testing, in accordance with workplace procedures 
Causes of abnormal air conditioning plant operating conditions are identified by analysing technical and operational information, in accordance with workplace procedures 
Corrective action is taken, in accordance with workplace procedures 
Air conditioning plant integrity and personnel safety is maintained, in accordance with workplace procedures, through consultation with appropriate personnel and technical and operational documentation 
 
 
 
 
 
Air conditioning plant is operated, in accordance with workplace procedures and manufacturers' operating recommendations 
 
 
 
Tests are performed on air conditioning plant, in accordance with workplace procedures 
 
 
Causes of abnormal air conditioning plant operating conditions are identified by analysing technical and operational information, in accordance with workplace procedures 
 
Air conditioning plant to be monitored or inspected is physically identified, in accordance with workplace procedures 
 
 
Air conditioning plant problems, movements and status are reported, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPOPS243 - Operate air conditioning plant
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS243 - Operate air conditioning plant

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: