Assessor Resource

UEPOPS358
Monitor and maintain wind farm civil assets

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to monitor and conduct preventative and remedial maintenance to ensure the integrity of civil assets associated with a wind farm.

Wind farm civil assets include infrastructuresuch as water treatment facilities, sewer pipelines, roads, utility grids, bridges, tunnels and railways. Civil asset maintenance in a wind power generation system involves the use of strategies to preserve and extend the service life of infrastructure.

Competency in this unit requires the ability to plan work, monitor wind farm civil assets, maintain wind farm civil assets and complete all work. Individuals will, in general, work as an operator, in a power generation facility.

Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Note: Workplace practice

The application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Maintenance work is completed and appropriate personnel are notified, in accordance with workplace procedures 
Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures 
Wind farm civil asset maintenance tools and equipment are maintained and stored, in accordance with manufacturers' specifications and workplace procedures 
Work completion details are finalised, in accordance with workplace procedures 
Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) standards, legislative requirements, industry standards, codes of practice, manufacturers' specifications, environmental obligations and workplace procedures are identified, applied and monitored 
 
 
 
 
Inspections of wind farm civil assets are completed, in accordance with workplace procedures and site requirements 
 
 
Maintenance of wind farm civil assets is undertaken, in accordance with workplace procedures and site requirements 
 
Maintenance work is completed and appropriate personnel are notified, in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEPOPS358 - Monitor and maintain wind farm civil assets
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS358 - Monitor and maintain wind farm civil assets

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: