Assessor Resource

UEPOPS360
Operate and monitor a hydro turbine

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to operate, inspect and monitor in-service hydro turbines. Turbines are a basic component in most methods of generating electricity in hydro generation power facilities.

Competency in this unit requires the ability to plan work, operate hydro turbine plant, test hydro turbine plant, analyse hydro turbine plant faults, monitor and inspect hydro turbine plant and the completion of all documentation. Individuals will, in general, work under supervision, in a power generation facility as an operator. Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Note: Workplace practice

The application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Safety issues related to operating and monitoring hydro turbine plant are identified, in accordance with workplace procedures and Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations and legislative requirements 
Work tasks and hydro turbine plant requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures 
Hydro turbine run up and loading schedule are ascertained from relevant documentation, in accordance with workplace procedures and site requirements 
Inspection, preoperational tests and field preparations for hydro turbine plant service are carried out, in accordance with workplace procedures and manufacturers' recommendations 
Hydro turbine plant operational prerequisites are established, in accordance with workplace procedures and manufacturers' recommendations 
Sequence for recommissioning of hydro turbine plant is determined, in accordance with workplace procedures and site requirements 
 
 
 
 
 
Output is adjusted to achieve required hydro turbine operating conditions and demand, in accordance with workplace procedures and operational requirements 
 
 
 
Operational tests are performed, in accordance with workplace procedures 
 
 
 
Cause of abnormal hydro turbine plant operating conditions are identified, in accordance with workplace procedures, and by analysing technical and operational information 
 
 
Hydro turbine plant to be monitored and inspected is physically identified, in accordance with workplace procedures 
 
 
 
Hydro turbine plant problems, movements, and status are reported, in accordance with workplace procedures 
 

Forms

Assessment Cover Sheet

UEPOPS360 - Operate and monitor a hydro turbine
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS360 - Operate and monitor a hydro turbine

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: