Assessor Resource

UEPOPS403
Coordinate permit to work system

Assessment tool

Version 1.0
Issue Date: May 2024


This unit involves the skills and knowledge required to coordinate the permit to work system in a power generation facility inclusive of its implementation and application on a day to day basis, during major power outages and in other projects.

Permits to workare a formal system used to control high risk activities in power generation facilities. They specify control measures to be used. Permits to work ensure that all hazards and precautions have been considered beforeany hazardous workbegins.

Competency in this unit requires the ability to plan implementation of permit to work procedures, coordination of power outage permit to work requirements and coordination of the permit to work system. Individuals will, in general, work as a coordinator, in a power generation facility.

Power generation plant operators are typically trained and authorised to isolate, prepare plant and issue permits to work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Note: Workplace practice

The application of the skills and knowledge described in this unit may require a licence or training permit to practice in the workplace where work is carried out on gas and electrical installations. Additional conditions may apply under state and territory legislative and regulatory licensing requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Permit to work requirements are identified from appropriate personnel and documentation, in accordance with workplace procedures 
 
 
 
 
 
Power outage plan is obtained from and confirmed with appropriate personnel, in accordance with workplace procedures 
 
 
 
 
 
 
Permit to work system is monitored and reviewed, and results are evaluated, in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEPOPS403 - Coordinate permit to work system
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEPOPS403 - Coordinate permit to work system

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: