Assessor Resource
UETTDRDS39
Prepare and manage detailed construction plans for electrical power system infrastructure
Assessment tool
Version 1.0
Issue Date: May 2024
This unit covers the preparation of detailed plans to be used during the design phase and preparation of as-built drawings during the construction phase and utilised by network owners as technical reference materials to detail system infrastructure. It includes the use of computer-aided drafting (CAD) or other relevant drafting methods.
The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work.
Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)