Assessor Resource
UETTDRIS49
Develop low voltage switching schedule
Assessment tool
Version 1.0
Issue Date: May 2024
This unit covers the preparation of a basic switching schedule for low voltage (LV) network. It includes planning basic outages and taking into account loading of network components. It also includes the calculation of network loading conditions to ensure the network is operating within design parameters.
The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work.
Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)