Assessor Resource
UETTDRTP31
Maintain energised transmission lines using high voltage live work stick method
Assessment tool
Version 1.0
Issue Date: June 2024
This unit covers the maintenance of energised high voltage transmission overhead electrical apparatus, i.e. live line work using line Stick techniques and includes the verification of the site conditions and the potential hazards, the conformation and calculation of physical loads and the selection of appropriate and authorised work method.
It includes the preparation and cleaning of specialist material and tools in accordance with authorised technical instructions.
It also encompasses the undertaking of work health and safety (WHS)/occupational health and safety (OHS) and safe working practices, and the rendering inoperative of the automatic re-closing device including its restoration, in accordance with the work plan and the procedures of issuing/accepting electrical access permits and or relevant work documents.
The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace.
Other conditions may apply under state and territory legislative and regulatory licensing requirements which must be confirmed prior to commencing this unit.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)