Google Links
Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge
Range Statement
Performance Evidence
The candidate must provide evidence that they can:install drainage system worksinterpret drainage system plans and drawingsinterpret site specifications, soil types and drainage system planslevel and align earthworksmeasure materials required to install drainage systemsprepare for installation activitiesset out drainage system worksset out, survey, test and excavate the installation sitetest the drainage system use equipment, tools and machinery appropriate to the scope of works
Knowledge Evidence
The candidate must demonstrate knowledge of:
principles and practices of drainage installationdrain types, components and installation techniquessoil characteristics and their impact on drainage systemspurposes of drainage systems and the application of drainage system plans to the physical situation work health and safety