Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Carry out pre-start checks
  2. Inspect and operate the system
  3. Monitor the irrigation operation
  4. Shut down the system in response to irrigation indicators

Required Skills

Required skills include

Ability to

read and follow operations manual and irrigation schedules

operate pressure and flow testing equipment

carry out prestart checks and prime pumps

start up system and carry out operational checks

measure and interpret flow rates and pressures

monitor system effectiveness

application rates

irrigation times

sprinkler output

pressure variations

salinity levels and water quality

depth of irrigation

energy efficiency

use control systems

shut down clean equipment and dispose of waste

use personal protective equipment

perform shut down procedures

take and record measurements of output and efficiency

record data

Required knowledge includes

Knowledge of

general irrigation methods for moving sprinkler systems

main components of moving sprinkler irrigation systems

pump types used in moving sprinkler irrigation systems and their operation

energy efficiency indicators benchmarks for moving sprinkler irrigation

Application Efficiency

Average Application Rate

Instantaneous Application Rate

shutdown sequence

environmental impacts of irrigation using water from any ground or underground source

soil characteristics

soilplantwater relationships

water requirements of plantscrops consistent with sound environmental management

critical measures for moisture availability

readily available water

wilting point

field capacity

monitoring soil compaction and drainage

environmental hazards of moving sprinkler systems including soil compaction and guttering

OHS legislation and safe work procedures

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this Unit

The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following

read and follow operations manual and irrigation schedules

carry out prestart checks

operate and inspect the system

measure and interpret flow rates and pressures

identify environmental hazards

shut down in response to irrigation indicators

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances


Range Statement

The range statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Moving sprinkler systems may include:

specifically hard and soft reel self-travelling irrigators, lateral move systems and centre pivots.

Moving sprinkler system components include:

spans

tower

tower wheels

outlets

emitters

droppers

pressure regulator

irrigation controller.