Elements and Performance Criteria
- Prepare for paving project
- Requirements of the paving project are clarified with client/supervisor and enterprise guidelines.
- Equipment and material resource requirements are identified according to the scope of the construction work and the supervisor's instructions.
- The environmental implications of the proposed work are identified.
- Occupational Health and Safety (OHS) hazards are identified, risks assessed and controls implemented.
- Personal protective equipment (PPE) is selected, used, maintained and stored.
- Delivery of materials to site is organised according to workplace priorities.
- Set out and prepare the site
- Site and hazards are identified, risks assessed and suitable controls implemented.
- Site bunting is erected, pedestrian access is controlled, and safety signage is placed where appropriate.
- Services are determined and located from site plans.
- Provision for irrigation lines to cross paved areas is made, where applicable.
- The paving pattern is marked out according to plans and specifications.
- Sub-base material is placed and compacted to the required finished levels.
- Surface drainage is incorporated according to design drawings and specifications.
- Coordinate paving project installation
- Check quality of work and clean up site
- Quality of finished works is inspected to ensure the standard of the finished project is in accordance with design drawings and specifications.
- Paved surfaces are cleaned down in an environmentally safe and sensitive manner.
- Tools and equipment are cleaned and stored according to enterprise guidelines.