Elements and Performance Criteria
- Plan and prepare for installation of extra low voltage wiring
- Installation is planned and prepared to ensure OHS policies and procedures are followed, and the work is appropriately sequenced according to requirements.
- Appropriate personnel are consulted to ensure the work is co-ordinated effectively with others on the work site.
- Cables and wires are sized to suit calculated load.
- Wiring system components are checked against job requirements.
- Accessories are obtained according to established procedures and to comply with organisational and task requirements.
- Location in which specific items of accessories, apparatus and circuits are to be installed is determined from job requirements.
- Materials necessary to complete the work are obtained according to established procedures and checked against the job requirement.
- Tools, equipment and testing devices needed to carry out the installation work are obtained, following established procedures they are checked for correct operation and safety.
- Preparatory work is checked to ensure that it complies with requirements and no unnecessary damage has occurred.
- Install wiring systems
- Occupational Health and Safety (OHS) policies and procedures for installing electrical wiring systems are followed.
- Wiring systems are installed to meet requirements, without damage or distortion to the surrounding environment or services.
- Accessories are terminated and wires are connected as required to solenoids and controllers, according to manufacturer and enterprise requirements.
- Unplanned events or conditions are responded to using established procedures.
- Approval is obtained from appropriate personnel according to established procedures before any contingencies are implemented.
- On-going checks of the quality of the work are undertaken according to established procedures.
- Check and notify completion of work