Elements and Performance Criteria
- Prepare for soil profile construction
- Prepare equipment for soil profile construction
- Undertake soil profile construction
- Restore the site after drainage and irrigation installation
- Back fill trenches with specified construction materials, consolidate and level
- Level the site as each layer of the soil profile is installed
- Water the site thoroughly on completion
- Remove and dispose of waste material from the site
- Clean, maintain and store tools, equipment and machinery
- Maintain a clean and safe area
- Record or report work outcomes