Elements and Performance Criteria
- Interpret installation plan
- Applicable OHS and organisational requirements relevant to the installation of plant, equipment or systems are verified and complied with throughout the work activity
- Instructions and plans are read and interpreted to identify processes and materials to complete work tasks
- Installation plan is interpreted in terms of the sequence and timing of activities, and action plan is initiated
- The proposed installation is discussed with designated staff to establish suitable times for the work to be conducted
- Arrangements are made for staffing to be available and/or contracted
- Arrangements are made for physical resources to be available and/or purchased/leased
- Obtain component parts, plant and/or equipment
- Supply arrangements of all component parts, plant and/or equipment are confirmed or arranged
- Arrangements are made for the delivery of all component parts, plant and/or equipment to the required locations on the specified dates in accordance with the installation plan
- Where necessary, arrangements are made for the storage of component parts, plant and/or equipment in accordance with the installation plan
- Prepare the work site
- Presentations required for the work site are interpreted from the design drawings and documentation
- Work site is prepared in accordance with the installation plan and the requirements of the manufacturer of the component parts, plant and/or equipment and OHS policies and procedures
- Prepared work site is checked for the compliance with the design drawings and specifications, and any necessary adjustments made
- Conduct installation of parts equipment, fixtures and/or extra low voltage wiring
- All parts, equipment, fixtures and/or extra low voltage wiring to be used in the installation are checked to ensure that they meet the specified technical and safety requirements
- Any necessary pre-installation preparation of parts, plant, equipment, fixtures and/or extra low voltage wiring is carried out in accordance with the installation plan and the technical specifications for the work
- Installation of the parts, plant, equipment, fixtures and/or extra low voltage wiring is carried out
- Verify installation
- Installation is checked against the design specifications, organisational quality standards, manufacturer instructions and OHS requirements
- Where the installation does not meet the specified requirements, the problem is reported and any necessary action taken
- Outcomes of the checks of the installation and any resulting action are documented