Elements and Performance Criteria
- Prepare site
- Site information and requirements are determined and confirmed with site supervisor or circuit manager
- Security and confidentiality issues are considered and risk management measures selected
- Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements
- Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards
- Assemble temporary work shelter
- Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures
- Work shelter is sourced and fittings information interpreted
- Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements
- Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required
- Position equipment and tooling in work area
- Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements
- Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements
- Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements
- Problems with work area are identified and reported to appropriate persons according to team procedures as required
- Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required
- Dismantle temporary work shelter
- Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements
- Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements
- Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements
- Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements
- Prepare site
- Site information and requirements are determined and confirmed with site supervisor or circuit manager
- Security and confidentiality issues are considered and risk management measures selected
- Hazards associated with work site are identified and risks are managed according to workplace procedures and safety requirements
- Access paths are considered when positioning equipment and tooling, and measures are taken to eliminate hazards
- Assemble temporary work shelter
- Tools and equipment are unloaded from transporters according to safety requirements and team requirements and procedures
- Work shelter is sourced and fittings information interpreted
- Shelter and associated fittings are assembled, erected and secured according to shelter manufacturer procedures, team requirements, event supplementary regulations, and safety requirements
- Problems with temporary work shelter are identified and reported to appropriate persons according to team procedures as required
- Position equipment and tooling in work area
- Equipment is assembled and prepared according to manufacturer procedures, team requirements and safety requirements
- Equipment is positioned according to team requirements, controlling body rules, category rules and supplementary regulations, and safety requirements
- Required personal protective equipment (PPE) is identified, fitted and installed according to manufacturer specifications and team requirements
- Problems with work area are identified and reported to appropriate persons according to team procedures as required
- Effectiveness of area layout is monitored during use, and recommendations are made for change to appropriate persons as required
- Dismantle temporary work shelter
- Shelter is cleaned, dismantled and packed in preparation for transportation according to team procedures and safety requirements
- Tooling and equipment are accounted for, checked and packed in preparation for transportation according to team procedures and safety requirements
- Shelter, tools and equipment are loaded on to vehicle transporters according to team procedures and safety requirements
- Work area is cleaned and inspected for serviceable condition according to team procedures and local requirements